EPC Submittal - Shared Plans 12 New Residential Building - New three story single family residence with first floor flex space and powder room. 1555 sq. f.t. 324 sq. ft. first floor, 601 sq. ft. second floor, 601 sq. f.t. third floor, 29 sq. ft. roof access, 94 sq. ft. balcony, 37 sq. ft. porch, 482 sq. ft. roof top deck, and 289 sq. ft. garage.
Shared with Res-1916523, Res-1916527, Res-1916532, Res-1916533, Res-1916533, Res-1916534, Res-1916535, Res-1916537, Res-1916554, Res-1916556, Res-1916560, Res-1916561 - PLNG-INSP
Last Updated: Dec 9, 2020
More Information
Review
Nov
18
2019
Review Begin
Cycle 3 Begin
Nov 18, 2019
History:
Aug 30, 2019
Cycle 1 Begin
Oct 22, 2019
Cycle 2 Begin
Nov 18, 2019
Cycle 3 Begin
Last Updated: 2019-11-20 05:04:21 UTC
Nov
18
2019
Construction Debris Review
Cycle 2 Correction
Nov 18, 2019
History:
Oct 1, 2019
Cycle 1 Correction
Nov 18, 2019
Cycle 3 Approved
Nov 18, 2019
Cycle 2 Correction
Last Updated: 2019-11-19 05:06:28 UTC
Nov
19
2019
Fire Review
Verify Cycle 1 Approved
Nov 19, 2019
History:
Sep 9, 2019
Cycle 1 Approved
Nov 19, 2019
Verify Cycle 1 Approved
Last Updated: 2019-11-21 05:04:27 UTC
Nov
19
2019
Development Engineering Review
Verify Cycle 1 Approved
Nov 19, 2019
History:
Sep 11, 2019
Cycle 1 Approved
Nov 19, 2019
Verify Cycle 1 Approved
Plan Review Comments
Sep 11, 2019
Based on the limited documents provided for review, the Public Works Department has not identified any conflict between the plans for the structure/improvements and other existing property interests.
Nov 19, 2019
Based on the limited documents provided for review, the Public Works Department has not identified any conflict between the plans for the structure/improvements and other existing property interests.
Last Updated: 2019-11-21 05:04:27 UTC
Nov
19
2019
Residential
Verify Cycle 1 Approved
Nov 19, 2019
History:
Sep 30, 2019
Cycle 1 Correction
Nov 5, 2019
Cycle 2 Approved
Nov 19, 2019
Verify Cycle 1 Approved
Last Updated: 2019-11-21 05:04:26 UTC
Nov
19
2019
Planning Review
Verify Cycle 1 Approved
Nov 19, 2019
History:
Sep 30, 2019
Cycle 1 Correction
Nov 12, 2019
Cycle 2 Approved
Nov 19, 2019
Verify Cycle 1 Approved
Last Updated: 2019-11-21 05:04:27 UTC
Nov
19
2019
Life Safety Review
Verify Cycle 1 Approved
Nov 19, 2019
History:
Oct 1, 2019
Cycle 1 Correction
Nov 13, 2019
Cycle 2 Approved
Nov 19, 2019
Verify Cycle 1 Approved
Last Updated: 2019-11-21 05:04:27 UTC
Nov
20
2019
Landscape Architect
Verify Cycle 1 Approved
Nov 20, 2019
History:
Sep 27, 2019
Cycle 1 Approved
Nov 20, 2019
Verify Cycle 1 Approved
Last Updated: 2019-12-11 05:03:27 UTC
Nov
20
2019
Utilities Review
Verify Cycle 1 Approved
Nov 20, 2019
History:
Sep 27, 2019
Cycle 1 Approved
Nov 20, 2019
Verify Cycle 1 Approved
Last Updated: 2019-12-11 05:03:27 UTC
Nov
20
2019
Structural Review
Verify Cycle 1 Approved
Nov 20, 2019
History:
Sep 27, 2019
Cycle 1 Correction
Nov 12, 2019
Cycle 2 Approved
Nov 20, 2019
Verify Cycle 1 Approved
Last Updated: 2019-12-11 05:03:27 UTC
Nov
20
2019
Formal Review
Approved
Nov 20, 2019
Plan Review Comments
Nov 20, 2019
Formal Review Subtasks Complete - Script7
Last Updated: 2019-12-11 05:03:26 UTC
Construction Debris Review
Target Date:
Nov 13, 2019
Permit Issuance
Dec
10
2019
Processing Permit
Waiting on applicant to provide info or docs (Process Wait)
EPC Submittal -Shared Plans 12 New three story single family residence with flex space and powder room on first floor. 1521 sq. ft. 290 sq. ft. first floor, 601 sq. ft. second floor, 601 sq. ft. third floor, 29 sq. ft. roof access, 266 sq. ft. garage and 482 sq. ft. roof top deck.
Plan reviewed and approved under main permit Res-1916521
EPC Submittal - Residential Infill Infrastructure Permit ONLY. Demo, Grading, and Utility work only for a residential subdivision of 12 lots. Work to include clearing of existing vacant lot, proposed pad grading, construction of common underground utilities (water, sewer, storm drain, and electrical),and paving the private drive and private walkways. Rammed aggregate pier ground improvement system to be a deferred item from this permit.
See Com-1916600 for deferred RAP ground improvement system.
Last Updated: Oct 22, 2019
More Information
Review
Mar
19
2019
Air Quality Review
Cycle 1 Approved
Mar 19, 2019
Plan Review Comments
Mar 19, 2019
This project is not jurisdictional to SMAQMD Rule 902 – Asbestos. District notification is not needed unless the scope of work changes to include demolition of structural/load-bearing elements or renovation of greater than 160sqft of suspect materials.
For more information please contact Jeffrey Yang (916)874-4550 or visit http://www.airquality.org/Businesses/Asbestos/Asbestos-in-Building-Materials
Last Updated: 2019-07-18 05:03:07 UTC
Jun
24
2019
Review Begin
Cycle 3 Begin
Jun 24, 2019
History:
Feb 19, 2019
Cycle 1 Begin
Apr 17, 2019
Cycle 2 Begin
Jun 24, 2019
Cycle 3 Begin
Last Updated: 2019-07-18 05:03:06 UTC
Jul
16
2019
Plumbing
Verify Cycle 1 Approved
Jul 16, 2019
History:
Mar 15, 2019
Cycle 1 Correction
May 6, 2019
Cycle 2 Approved
Jul 16, 2019
Verify Cycle 1 Approved
Last Updated: 2019-07-18 05:03:07 UTC
Jul
17
2019
Electrical Review
Verify Cycle 1 Approved
Jul 17, 2019
History:
Mar 18, 2019
Cycle 1 Correction
May 7, 2019
Cycle 2 Approved
Jul 17, 2019
Verify Cycle 1 Approved
Last Updated: 2019-07-19 05:03:22 UTC
Jul
17
2019
Planning Review
Verify Cycle 1 Approved
Jul 17, 2019
History:
Mar 18, 2019
Cycle 1 Correction
May 6, 2019
Cycle 2 Approved
Jul 17, 2019
Verify Cycle 1 Approved
Plan Review Comments
Mar 18, 2019
P18-047 not approved yet.
Last Updated: 2019-07-19 05:03:22 UTC
Jul
18
2019
Fire Review
Verify Cycle 1 Approved
Jul 18, 2019
History:
Feb 27, 2019
Cycle 1 Correction
Apr 23, 2019
Cycle 2 Approved
Jul 18, 2019
Verify Cycle 1 Approved
Last Updated: 2019-07-23 05:03:46 UTC
Jul
18
2019
Utilities Review
Verify Cycle 1 Approved
Jul 18, 2019
History:
Mar 19, 2019
Cycle 1 Correction
May 8, 2019
Cycle 2 Correction
Jul 16, 2019
Cycle 3 Approved
Jul 18, 2019
Verify Cycle 1 Approved
Last Updated: 2019-07-23 05:03:46 UTC
Jul
18
2019
Development Engineering Review
Verify Cycle 1 Approved
Jul 18, 2019
History:
Mar 19, 2019
Cycle 1 Correction
May 7, 2019
Cycle 2 Approved
Jul 18, 2019
Verify Cycle 1 Approved
Plan Review Comments
May 7, 2019
Based on the limited documents provided for review, the Public Works Department has not identified any conflict between the plans for the structure/improvements and other existing property interests.
Jul 18, 2019
Based on the limited documents provided for review, the Public Works Department has not identified any conflict between the plans for the structure/improvements and other existing property interests.
Last Updated: 2019-07-23 05:03:47 UTC
Jul
18
2019
Formal Review
Approved
Jul 18, 2019
Plan Review Comments
Jul 18, 2019
Formal Review Subtasks Complete - Script2
Last Updated: 2019-07-23 05:03:46 UTC
Permit Issuance
Jul
24
2019
Processing Permit
Waiting on applicant to provide info or docs (Process Wait)
Due Date:
Jul 23, 2019
Jul 24, 2019
Aug
2
2019
Processing Permit
Waiting on applicant to provide info or docs (Process Wait)
Due Date:
Jul 30, 2019
Aug 2, 2019
Aug
21
2019
Processing Permit
Ready-to-Issue
Aug 21, 2019
Aug
21
2019
Ready To Issue
Permit Issued; applicant can begin work
Aug 21, 2019
Aug
21
2020
Issued
Permit Expired
Due Date:
Aug 21, 2019
Aug 21, 2020
Comments
Aug 21, 2020
Task completed by batch script BuildingPermitExpiration
Last Updated: 2020-08-21 09:11:16 UTC
Inspection
Oct
10
2019
44 Plmg-Storm Drain
Partially Approved
Oct 10, 2019
Inspector's Comments
Oct 10, 2019
P-44; Storm drains and DI.
RWL-West side of lot
See Civil sheet C4.
Last Updated: 2020-08-21 21:11:58 UTC
Oct
11
2019
43 Plmg-Sewer Service
Partially Approved
Oct 11, 2019
History:
Oct 2, 2019
Scheduled
Oct 2, 2019
Partially Approved
Oct 9, 2019
Cancelled
Oct 11, 2019
Scheduled
Oct 11, 2019
Partially Approved
Inspector's Comments
Oct 2, 2019
Twelve sewer laterals and trunk line to alley ok to backfill.
Oct 11, 2019
This inspection storm drain east and west side of project north to south approved OK to cover see highlighted area sheet C4.0. Email from ERO approving point of connection attached.
Last Updated: 2020-08-21 21:11:58 UTC
Oct
21
2019
42 Plmg-Water Service
Partially Approved
Oct 21, 2019
History:
Oct 17, 2019
Partially Approved
Oct 21, 2019
Scheduled
Oct 21, 2019
Partially Approved
Inspector's Comments
Oct 17, 2019
1”, 2”, & 4” Water ok to bury. Test after.
Oct 21, 2019
P-42; Pressure tested the water services 1”-4”: OK
EPC Submittal - New Residential Building - Residential Infill Infrastructure Permit ONLY. Demo, Grading, and Utility work only for a residential subdivision of 12 lots. Work to include clearing of existing vacant lot, proposed pad grading, construction of common underground utilities (water, sewer, storm drain, and electrical),and paving the private drive and private walkways.
This project consists of a Tentative Subdivision Map to subdivide an existing parcel into 12 parcels and Site Plan Design Review for construction of 12 single unit dwellings with setback deviations and layout of the proposed lots.
Attachments:
Sign up to receive real-time alerts about this property's progress.
Looks like this page is not loading.
Please try again later.
You can also send us a message using the
Feedback
button at the bottom of the page & we will look into this as soon as possible.
Thank you for helping us make this application better for everyone.
Plan Review Comments