  • Permit: #COM-2014838
    revision (Commercial Revision)

    Complete
    Description:
    EPC - revision to COM-1925297 Removed 100% OSA unit, using explosion proof mini-split for cooling C1D1 Booth instead. Provided fan and intake damper to bring in minimum OSA requirement in C1D1 Booth. Provided scrubbing filter for odor control in C1D1 Booth.
    Last Updated: Dec 14, 2020

    Review

    Review Begin
    Cycle 2 Begin

    History:
    Aug 19, 2020
    Cycle 1 Begin
    Dec 8, 2020
    Cycle 2 Begin
    Last Updated: 2020-12-10 07:16:50 UTC
    Electrical Review
    Verify Cycle 1 Approved

    History:
    Aug 20, 2020
    Cycle 1 Approved
    Dec 8, 2020
    Verify Cycle 1 Approved
    Last Updated: 2020-12-10 07:16:51 UTC
    Planning Review
    Cycle 2 Approved

    History:
    Aug 25, 2020
    Cycle 1 Correction
    Dec 8, 2020
    Verify Cycle 1 Approved
    Dec 8, 2020
    Cycle 2 Approved
    Last Updated: 2020-12-10 07:16:54 UTC
    Mechanical Review
    Verify Cycle 1 Approved

    History:
    Aug 25, 2020
    Cycle 1 Approved
    Dec 8, 2020
    Verify Cycle 1 Approved
    Last Updated: 2020-12-10 07:16:51 UTC
    Fire Review
    Verify Cycle 1 Approved

    History:
    Aug 26, 2020
    Cycle 1 Approved
    Dec 9, 2020
    Verify Cycle 1 Approved

    Plan Review Comments

    Aug 26, 2020
    Entry made for Spencer Tomlinson
    Last Updated: 2020-12-15 07:14:24 UTC
    Formal Review
    Approved

    Plan Review Comments

    Dec 9, 2020
    Formal Review Subtasks Complete - Script7
    Last Updated: 2020-12-15 07:14:22 UTC

    Permit Issuance

    Processing Permit
    Ready For Pickup
    Ready For Pickup
    Complete
    to receive an email alert when the next activity occurs
  • Permit: #SUB-2014630
    Residential Plan Review Submittal

    Accepted
    Description:
    Removed 100% OSA unit, using explosion proof mini-split for cooling C1D1 Booth instead. Provided fan and intake damper to bring in minimum OSA requirement in C1D1 Booth. Provided scrubbing filter for odor control in C1D1 Booth.
    Last Updated: Aug 17, 2020
    to receive an email alert when the next activity occurs
  • Plan: #PLN20-02603
    Planning Online Submittal

    Ready for Building
    Description:
    Removed 100% OSA unit, using explosion proof mini-split for cooling C1D1 Booth instead. Provided fan and intake damper to bring in minimum OSA requirement in C1D1 Booth. Provided scrubbing filter for odor control in C1D1 Booth.
    Last Updated: Aug 14, 2020
    Planning Review
    Ready for Building
    to receive an email alert when the next activity occurs
  • Plan: #Z20-068
    8671 Elder Creek Volatile Manufacturing CUP Modification of Z17-193, Z18-119, Z19-056, Z19-155. (Z Files)

    Approved
    Description:
    To modify a previously approved Conditional Use Permit (CUP) for cannabis production (file Z17-193, modified by Z18-119, Z19-056, & Z19-155). More specifically, the proposed project is to allow for floor plan changes to allow for volatile manufacturing in a previously approved manufacturing suite. The project site is on approximately 4.37 acres in the in the Heavy Industrial Zone (M-2S). The project site has also been previously approved for a delivery-only dispensary (Z19-056).
    Attachments:

    Z17-193_ROD

    Download Failed

    Z18-119_ROD-Min-Mod

    Download Failed

    Z19-056_ROD

    Download Failed

    Z19-155_ROD-Minor-Mod_Z19-056

    Download Failed

    Z20-068_APP--

    Download Failed

    Z20-068_PLANS

    Download Failed

    Z20-068_ROD-CUP-mMod_Z19-155_Z18-056_Z17-193_Z18-119

    Download Failed


    Contact:
    Robert W. Williams
    916-808-7686
    Last Updated: Oct 24, 2020
    Application Submittal
    Ready for Review
    Zoning Review
    Approved

    History:
    Sep 1, 2020
    Revisions-Re-Route
    Oct 21, 2020
    Minor Mod Analysis
    Oct 22, 2020
    Waiting
    Oct 23, 2020
    In Progress
    Oct 23, 2020
    Approved

    Plan Review Comments

    Sep 1, 2020
    Sent to Police and Fire etc.

    Oct 21, 2020
    See Attached.

    Oct 22, 2020
    Development Tracker Reset

    Oct 23, 2020
    Development Tracker reset.
    Last Updated: 2020-10-26 07:02:57 UTC
    to receive an email alert when the next activity occurs
  • Plan: #PLN20-02024
    Planning Online Submittal

    Entitlement Review
    Description:
    Minor Modification to CUP
    Attachments:

    8671_ELDER_CREEK_RD_APP

    Download Failed

    8671_ELDER_CREEK_RD_PLANS

    Download Failed

    Last Updated: Jul 16, 2020
    Planning Review
    Entitlement Required

    Plan Review Comments

    Jul 20, 2020
    Hello,

    Thank you for your recent Planning Application submittal for 8671 Elder Creek. Your application has been reviewed and accepted and has been assigned file number Z20-068. The project requires CUP: Minor Modification for the following entitlement: Add Volatile Manufacturing.

    Fees due: $1470.08

    Visit the link below and search record number Z20-068 to pay your Planning Application fees electronically.

    Please pay your fees within 5 calendar days of this e-mail or application will be void. No further review of your application will be done until fees have been received.

    http://www.cityofsacramento.org/Community-Development/Planning/e-Planning



    Thank you,

    Pamela Morgan

    Associate Planner

    planningsubmit@cityofsacramento.org
    Last Updated: 2020-07-22 05:23:00 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1925297
    CANNABIS: Extracation Booth (Commercial Remodel)

    Issued
    Description:
    Install Extraction booth in existing F-1 occupancy space. 140 sf booth with mechanical, plumbing, electrical, fire sprinkler changes. **SOP has been uploaded in attachments**
    Last Updated: Jan 2, 2020

    Review

    Mechanical Review
    Cycle 1 Approved
    Plumbing
    Cycle 1 Approved
    Fire Review
    Cycle 1 Approved

    Plan Review Comments

    Jan 10, 2020
    approved with conditions
    Last Updated: 2020-01-18 05:08:46 UTC
    Planning Review
    No Review Required

    Plan Review Comments

    Jan 14, 2020
    has planning exemption stamp
    Last Updated: 2020-01-18 05:08:46 UTC
    Electrical Review
    Cycle 1 Approved
    Life Safety Review
    Cycle 1 Approved
    Review Begin
    Cycle 2 Begin

    History:
    Dec 24, 2019
    Cycle 1 Begin
    Feb 10, 2020
    Cycle 2 Begin
    Last Updated: 2020-02-27 14:58:00 UTC
    Formal Review
    Approved

    History:
    Jan 8, 2020
    Approved
    Feb 24, 2020
    Approved

    Plan Review Comments

    Feb 24, 2020
    Formal Review Subtasks Complete - Script7
    Last Updated: 2020-02-27 14:58:00 UTC
    Structural Review
    Cycle 2 Approved

    History:
    Jan 9, 2020
    Cycle 1 Correction
    Feb 24, 2020
    Cycle 2 Approved
    Last Updated: 2020-02-27 14:58:00 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    to receive an email alert when the next activity occurs
  • Plan: #Z19-155
    8671 Elder Creek Modification to CUP Z19-056 (Z Files)

    Approved
    Description:
    The proposed project is for changes to the floor plan of a building that was previously approved for cannabis production; specifically, a reallocation of the square footages for the cannabis cultivation, distribution, and manufacturing areas. The property has a previously approved Conditional Use Permit (CUP) for cannabis production (files Z17-193, Z18-119, & Z19-056), along with a CUP for a delivery-only cannabis dispensary (Z19-056).‬‬‬‬‬ This project requires a modification of the cannabis production CUP. The project site is a 4.37-acre parcel, in the Heavy Industrial Zone (M-2S).
    Attachments:

    Z19-155_APP---

    Download Failed

    Z19-155_ROD-Minor-Mod_Z19-056

    Download Failed


    Contact:
    Robert W. Williams
    916-808-7686
    Last Updated: Mar 16, 2020
    Application Submittal
    Ready for Review
    Zoning Review
    Approved

    History:
    Mar 16, 2020
    Minor Mod Analysis
    Mar 17, 2020
    Minor Mod Analysis
    Mar 18, 2020
    Approved

    Plan Review Comments

    Mar 16, 2020
    See Attached.

    Mar 17, 2020
    See Attached.

    Mar 18, 2020
    Minor Mod Approved.
    Last Updated: 2020-03-19 05:20:12 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1924999
    Cannabis Remodel (SUITES 640/660/680) (Commercial Remodel)

    Issued
    Description:
    Remodel of existing warehouse w/ office space into cannabis distribution and non-storefront delivery. Demo limited to new door opening at existing walls. new partition walls - PLNG-INSP
    Last Updated: Jan 31, 2020

    Review

    Development Engineering Review
    Cycle 1 Approved

    Plan Review Comments

    Dec 30, 2019
    Based on the limited documents provided for review, the Public Works Department has not identified any conflict between the plans for the structure/improvements and other existing property interest.
    Last Updated: 2020-01-30 05:09:36 UTC
    Mechanical Review
    Cycle 1 Approved

    Plan Review Comments

    Jan 7, 2020
    Spoke to Blair (applicant), no manufacturing, only delivery and rolling joints.
    Last Updated: 2020-01-30 05:09:35 UTC
    Plumbing
    Cycle 1 Approved
    Fire Review
    Cycle 1 Approved
    Structural Review
    Cycle 1 Approved
    Electrical Review
    Cycle 1 Approved
    Planning Review
    Cycle 1 Approved
    Review Begin
    Cycle 2 Begin

    History:
    Dec 20, 2019
    Cycle 1 Begin
    Jan 16, 2020
    Cycle 2 Begin
    Last Updated: 2020-01-30 05:09:35 UTC
    Utilities Review
    Cycle 2 Approved

    History:
    Jan 7, 2020
    Cycle 1 Correction
    Jan 17, 2020
    Cycle 2 Approved
    Last Updated: 2020-01-30 05:09:35 UTC
    Life Safety Review
    Cycle 2 Approved

    History:
    Jan 10, 2020
    Cycle 1 Correction
    Jan 29, 2020
    Cycle 2 Approved
    Last Updated: 2020-01-31 05:19:28 UTC
    Formal Review
    Approved

    Plan Review Comments

    Jan 29, 2020
    Formal Review Subtasks Complete - Script7
    Last Updated: 2020-01-31 05:19:28 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work

    Inspection

    22 Bldg-Sheetrock Nailing
    Partially Approved
    89 Planning FINAL
    Scheduled
    79 Elect FINAL
    Approved

    History:
    Aug 28, 2020
    Scheduled
    Aug 31, 2020
    Approved

    Inspector's Comments

    Aug 31, 2020
    Inspection conducted via FaceTime and conversation with contractor, due to Covid-19 situation.



    Electrical final inspection approved.



    Inspector

    John Briel

    jbriel@cityofsacramento.org

    (916)718-7260
    Last Updated: 2020-08-31 21:34:59 UTC
    59 Plmg FINAL
    Correction Notice

    History:
    Jun 5, 2020
    Scheduled
    Sep 9, 2020
    Correction Notice

    Inspector's Comments

    Sep 9, 2020
    Install portable eyewash ERO to clarify model and type. Letter needed from the ERO.



    ERO to clarify TMV-1 thermostatic mixing valve. (Location) letter needed from the ERO.



    Access to roof needed to complete inspection.



    Balance report approved.

    (Title 24 not needed existing unit)



    Recall plumbing and mechanical final when corrections are corrected.
    Last Updated: 2020-09-09 22:30:52 UTC
    29 Bldg FINAL
    Inspector Locked Out (no inspection)

    History:
    Jun 5, 2020
    Cancelled
    Sep 9, 2020
    Scheduled
    Sep 9, 2020
    Inspector Locked Out (no inspection)

    Inspector's Comments

    Sep 9, 2020
    No contact number was provided for contact
    Last Updated: 2020-09-10 00:34:47 UTC
    39 Mech FINAL
    Correction Notice

    History:
    Sep 9, 2020
    Scheduled
    Sep 9, 2020
    Correction Notice
    Last Updated: 2020-09-09 22:26:14 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1923847
    CANNABIS: Suite # 700 - HVAC Exhaust Hood -Air Duct- RotoEvap Machine (Commercial Remodel)

    Finaled
    Description:
    Suite # 700 - HVAC Exhaust Hood - Air Duct -(N) RotoEvap Machine
    Last Updated: Apr 3, 2020

    Review

    Review Begin
    Cycle 1 Begin
    Mechanical Review
    Cycle 1 Approved
    Electrical Review
    Cycle 1 Approved
    Planning Review
    Cycle 1 Approved
    Fire Review
    Cycle 1 Approved

    History:
    Dec 19, 2019
    Cycle 1 Approved
    Dec 19, 2019
    Cycle 1 Correction
    Jan 22, 2020
    Cycle 1 Approved

    Plan Review Comments

    Jan 22, 2020
    City Cycle 1 CSG Cycle 2
    Last Updated: 2020-02-05 05:05:11 UTC
    Formal Review
    Approved

    History:
    Dec 20, 2019
    Approved
    Feb 3, 2020
    Approved

    Plan Review Comments

    Feb 3, 2020
    Formal Review Subtasks Complete - Script7
    Last Updated: 2020-02-05 05:05:11 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    79 Elect FINAL
    Approved

    History:
    Mar 13, 2020
    Scheduled
    Mar 16, 2020
    Approved
    Last Updated: 2020-04-04 05:05:19 UTC
    39 Mech FINAL
    Approved

    History:
    Mar 13, 2020
    Scheduled
    Mar 13, 2020
    Correction Notice
    Mar 17, 2020
    Approved

    Inspector's Comments

    Mar 13, 2020
    Stainless steel hood and ducting required as per plan.



    Air balance report needed for CFM of hood under alarm condition.

    Mar 17, 2020
    CFM minimum of hood 945 CFM witnessed balance of 967 CFM. Under alarm condition.



    Letter from ERO approving construction of galvanize hood and venting attached.

    Last Updated: 2020-04-04 05:05:19 UTC
    900 Other Systems
    Approved

    History:
    Mar 18, 2020
    Correction Notice
    Mar 18, 2020
    Cancelled
    Apr 3, 2020
    Approved

    Inspector's Comments

    Apr 3, 2020
    Ethanol gas detection and hood.
    Last Updated: 2020-04-04 05:05:19 UTC
    194 Fire FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #COM-1914874
    Revision-to COM-1903229 (Commercial Revision)

    Complete
    Description:
    EXPEDITED - Revision to clarify the location of accessible route from building entry to parking
    Last Updated: Aug 7, 2019

    Permit Issuance

    Processing Permit
    Ready For Pickup
    Ready For Pickup
    Complete
    to receive an email alert when the next activity occurs
  • Plan: #Z19-056
    8671 Elder Creek CUP - Non-Storefront Delivery (Z Files)

    Approved
    Description:
    A Conditional Use Permit modification to an existing Cannabis Production CUP (Z17-193 and Z18-119) to decrease the allowed cannabis cultivation square footage by 6,022 square feet to create a 4,077 square foot cannabis distribution suite and reserve 1,945-square-feet for a Delivery-Only Cannabis Dispensary suite within an existing 64,740-square-foot building located on a ±4.37-acre property in the Heavy Industrial (M-2S) zone. A Conditional Use Permit application to operate a Delivery-Only Cannabis Dispensary for medical- and adult-use within a 1,945-square-foot square foot suite of a 64,740-square foot warehouse located on a 4.37-acre lot in the Heavy Industrial M-2S zone. Site Plan and Design Review for minor exterior modifications to a 64,740-square foot warehouse located on a 4.37-acre lot in the M-2S zone.
    Attachments:

    Z19-056 - App

    Download Failed

    Z19-056 - Site Photos

    Download Failed

    Z19-056 - Site Plans

    Download Failed

    Z19-056 Record of Decision

    Download Failed

    Z19-056 Revised Project Plans

    Download Failed

    Z19-056 Routing Sheet

    Download Failed


    Contact:
    Kevin Valente
    916.372.6100
    Last Updated: Sep 10, 2019
    Application Submittal
    Ready for Review

    Comments

    Jun 10, 2019
    PLACED IN HEARING BIN
    Last Updated: 2019-06-12 05:17:26 UTC
    Application Submittal
    Note
    Due Date: Jun 13, 2019

    Comments

    Jun 10, 2019
    WAITING ON APPLICANT TO PAY FEES. APPLICANT TO RETURN LATER TODAY TO PAY WITH CHECK.
    Last Updated: 2019-06-11 05:13:50 UTC
    Zoning Review
    Approved

    History:
    Sep 10, 2019
    Hearing Scheduled
    Oct 18, 2019
    Approved

    Plan Review Comments

    Sep 10, 2019
    Scheduled project for September 25, 2019 hearing at 9 AM.

    Oct 18, 2019
    Approved on October 18, 2019 with conditions. Appeal period ends October 28, 2019 at 4:00 pm.
    Last Updated: 2019-10-20 05:21:16 UTC
    to receive an email alert when the next activity occurs
  • Plan: #Z19-052
    8671 Elder Creek CUP - Non-Storefront Delivery (Z Files)

    Void
    Description:
    Request to add the use of Cannabis Non-Storefront Delivery. Previously approved (Z18-119) Cannabis Manufacture and Distribution Use & (Z17-193) Cannabis Cultivation Use in existing buildings in M2-S zone in Council District 6. (Applicant has been advised there is high potential for request denial based on over-concentration of Cannabis uses in Council District 6.)
    Last Updated: May 29, 2019
    Application Submittal
    Note
    Due Date: May 31, 2019

    Comments

    May 28, 2019
    EMAILED APPLICANT TO PAY FEES. MUST BE PAID BY JUNE 3RD BY THE END OF THE DAY.
    Last Updated: 2019-05-30 05:18:29 UTC
    Application Submittal
    Note
    Due Date: May 31, 2019

    Comments

    May 29, 2019
    UPDATED FEES AND EMAILED APPLICANT OF THE CHANGE. NO PAYMENT HAS BEEN MADE FOR PRIOR FEES. ORIGINAL FEES WERE VOIDED.
    Last Updated: 2019-06-07 06:03:48 UTC
    Application Submittal
    Void

    Comments

    Jun 5, 2019
    APPLICANT FAILED TO PAY FEES WITHIN THE 5 DAY PERIOD. APPLICATION DOCUMENTS WILL BE PLACED IN THE WILL CALL BIN.
    Last Updated: 2019-06-07 06:03:47 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1903229
    CANNABIS: Suite 700 : 4915 SF Cannabis Man. Facility w/ non-volitile extraction & CO2 enrich (Commercial Remodel)

    Finaled
    Description:
    Suite 700: 4915 SF Single story Cannabis Manufacturing Facility w/ non-volatile extraction & CO2 enrich. Work will include relocation of plumbing fixtures and replacement of a door. No Ethonol is being used in the manufacturing process. - PLNG-INSP See revision COM-1914874- clarify accessible path of travel
    Last Updated: Oct 30, 2019

    Review

    Utilities Review
    Cycle 1 Approved

    Plan Review Comments

    Mar 11, 2019
    interior remodel only
    Last Updated: 2019-03-14 05:28:23 UTC
    Planning Review
    Cycle 1 Approved
    Development Engineering Review
    Cycle 1 Approved

    Plan Review Comments

    Mar 14, 2019
    Based on the limited documents provided for review, the Public Works Department has not identified any conflict between the plans for the structure/improvements and other existing property interests.
    Last Updated: 2019-03-21 05:36:04 UTC
    Construction Debris Review
    Cycle 2 Approved

    History:
    Mar 20, 2019
    Cycle 1 Correction
    Apr 30, 2019
    Cycle 2 Approved
    Last Updated: 2019-05-11 05:05:50 UTC
    Fire Review
    Cycle 2 Approved

    History:
    Mar 1, 2019
    Cycle 1 Correction
    May 2, 2019
    Cycle 2 Approved
    Last Updated: 2019-05-11 05:05:50 UTC
    Life Safety Review
    Cycle 2 Approved

    History:
    Mar 18, 2019
    Cycle 1 Correction
    May 10, 2019
    Cycle 2 Approved
    Last Updated: 2019-05-11 05:05:50 UTC
    Mechanical Review
    Cycle 3 Approved

    History:
    Mar 11, 2019
    Cycle 1 Correction
    May 9, 2019
    Cycle 2 Correction
    May 17, 2019
    Cycle 3 Approved
    Last Updated: 2019-05-30 05:03:22 UTC
    Plumbing
    Cycle 3 Approved

    History:
    Mar 11, 2019
    Cycle 1 Correction
    May 9, 2019
    Cycle 2 Correction
    May 17, 2019
    Cycle 3 Approved
    Last Updated: 2019-05-30 05:03:22 UTC
    Electrical Review
    Cycle 3 Approved

    History:
    Mar 15, 2019
    Cycle 1 Correction
    May 7, 2019
    Cycle 2 Correction
    May 29, 2019
    Cycle 3 Approved
    Last Updated: 2019-05-31 05:03:29 UTC
    Review Begin
    Cycle 4 Begin

    History:
    Feb 22, 2019
    Cycle 1 Begin
    Apr 26, 2019
    Cycle 2 Begin
    May 14, 2019
    Cycle 3 Begin
    Jun 5, 2019
    Cycle 4 Begin
    Last Updated: 2019-06-07 05:12:15 UTC
    Structural Review
    Cycle 4 Approved

    History:
    Mar 14, 2019
    Cycle 1 Approved
    Jun 7, 2019
    Cycle 4 Approved
    Last Updated: 2019-06-09 05:01:26 UTC
    Formal Review
    Approved

    History:
    May 29, 2019
    Approved
    Jun 7, 2019
    Approved

    Plan Review Comments

    May 29, 2019
    Formal Review Subtasks Complete - Script2

    Jun 7, 2019
    Formal Review Subtasks Complete - Script2
    Last Updated: 2019-06-09 05:01:26 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Processing Permit
    Waiting on applicant to provide info or docs (Process Wait)
    Due Date: Jun 12, 2019
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    200.1Fire Sprinkler - Overhead Visual
    Approved
    12 Bldg-Concrete Slab Forms
    Approved

    Inspector's Comments

    Aug 9, 2019
    Pour back at slab cuts. Approved
    Last Updated: 2019-08-10 05:27:32 UTC
    40 Plmg-Underfloor/Slab
    Approved

    History:
    Jul 22, 2019
    Partially Approved
    Aug 8, 2019
    Correction Notice
    Aug 9, 2019
    Scheduled
    Aug 9, 2019
    Cancelled
    Aug 13, 2019
    Approved

    Inspector's Comments

    Jul 22, 2019
    P-40; OK to cover line with floor sink, floor drain and emergency shower to tie-in.

    Replumb the janitor sink waste; vent required, low-heel on it’s side. Use long sweep 90 or combination wye and 1/8 bend. Replace the fernco coupling with no-hub coupling.

    Recall underground plumbing when ready.

    Aug 8, 2019
    Replumb waste near the restrooms as per previous Correction Notice.

    Aug 9, 2019
    Correction corrected

    Aug 13, 2019
    Correction corrected
    Last Updated: 2019-10-31 05:03:24 UTC
    41 Plmg-Top/Rough
    Approved
    21 Bldg-Frame Ceiling (T-Bar)
    Approved

    History:
    Sep 5, 2019
    Scheduled
    Sep 8, 2019
    Approved

    Inspector's Comments

    Sep 8, 2019
    Wrong inspection scheduled. Wall framing approved
    Last Updated: 2019-10-31 05:03:24 UTC
    22 Bldg-Sheetrock Nailing
    Partially Approved

    Inspector's Comments

    Sep 13, 2019
    Date: 9/13/2019

    Room #108 - Lid - Approved
    Last Updated: 2019-09-14 05:27:11 UTC
    19 Bldg-Frame
    Cancelled

    Inspector's Comments

    Sep 13, 2019
    Date: 9/13/2019

    Contractor was looking for a #22 inspection
    Last Updated: 2019-09-14 05:27:11 UTC
    200.2 Fire Sprinkler - Overhead Hydro
    Not Ready

    History:
    Sep 23, 2019
    Scheduled
    Sep 25, 2019
    Not Ready
    Last Updated: 2019-10-31 05:03:24 UTC
    701.1 Access
    Not Ready

    History:
    Sep 23, 2019
    Scheduled
    Sep 25, 2019
    Not Ready
    Last Updated: 2019-10-31 05:03:25 UTC
    89 Planning FINAL
    Approved

    Inspector's Comments

    Sep 27, 2019
    All planning conditions approved. Okay for certificate of occupancy.
    Last Updated: 2019-09-28 05:37:26 UTC
    39 Mech FINAL
    Partially Approved

    History:
    Sep 26, 2019
    Correction Notice
    Sep 30, 2019
    Partially Approved

    Inspector's Comments

    Sep 26, 2019
    Provide hot water to all fixtures.

    Complete supporting for the exhaust duct.

    Complete the required wiring to the exhaust fan on the roof.

    Recall finals when the above has been completed.

    Sep 30, 2019
    M-39; Partial.

    Provide the EOR letter on the CO2 system.

    Special Inspection Report provided.

    OK to occupy, OK for TCO.
    Last Updated: 2019-10-31 05:03:25 UTC
    59 Plmg FINAL
    Approved

    History:
    Sep 26, 2019
    Correction Notice
    Oct 1, 2019
    Approved

    Inspector's Comments

    Sep 26, 2019
    Provide hot water to all fixtures.

    Complete supporting for the exhaust duct.

    Complete the required wiring to the exhaust fan on the roof.

    Recall finals when the above has been completed.

    Oct 1, 2019
    P-59; OK to occupy.
    Last Updated: 2019-10-31 05:03:25 UTC
    63 Elect-Rough
    Approved

    History:
    Sep 30, 2019
    Inspector Overloaded - rescheduled for next business day
    Oct 2, 2019
    Approved
    Last Updated: 2019-10-03 05:22:12 UTC
    67 Elect-Temp Power-SMUD
    Approved

    History:
    Sep 30, 2019
    Inspector Overloaded - rescheduled for next business day
    Oct 2, 2019
    Approved

    Inspector's Comments

    Oct 2, 2019
    NEW COMMERCIAL METER RELEASE

    800A 277/480V METER

    SUITE 700



    Inspector

    John Briel

    (916)718-7260
    Last Updated: 2019-10-03 05:22:12 UTC
    701 Knox Box
    Approved

    History:
    Sep 23, 2019
    Scheduled
    Sep 25, 2019
    Not Ready
    Oct 3, 2019
    Approved
    Last Updated: 2019-10-31 05:03:25 UTC
    302 CO2 System
    Approved

    History:
    Oct 3, 2019
    Correction Notice
    Oct 3, 2019
    Rescheduled
    Oct 10, 2019
    Approved
    Last Updated: 2019-10-12 05:29:56 UTC
    900 Other Systems
    Partially Approved
    29 Bldg FINAL
    Scheduled

    History:
    Oct 10, 2019
    Correction Notice
    Oct 25, 2019
    Scheduled

    Inspector's Comments

    Oct 10, 2019
    1. Complete Fire Departments final inspection approval.

    Permission to apply for TCO may be granted after Building Inspector can verify that

    Fire Department approval for use of space and equipment is given.

    Application for TCO must be submitted to Building Department.



    Reschedule inspection when ready



    Joe Eisele

    916-223-6650
    Last Updated: 2019-10-26 05:24:12 UTC
    to receive an email alert when the next activity occurs
  • Permit: #19TMP-000143
    Commercial Plan Review Submittal

    Unknown
    Description:
    EPC Submittal - 1st Time Occupancy of Commercial Building - Type 6 Manufacturing (Cannabis)
    Last Updated: Jan 4, 2019
    to receive an email alert when the next activity occurs
  • Permit: #COM-1823181
    Electrical Service Upgrade (Commercial Remodel)

    Finaled
    Description:
    Install new 4,000 amp 480/277 volt, 3-phase electrical service to the building.
    Last Updated: Jul 3, 2019

    Review

    Review Begin
    Cycle 1 Begin
    Electrical Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    Dec 21, 2018
    Formal Review Subtasks Complete - Script2
    Last Updated: 2018-12-23 05:02:32 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    66 Elec-Serv Undergrnd Conduit
    Approved

    Inspector's Comments

    Mar 21, 2019
    Date: 3/21/2019

    Change to original plans:

    Original called for (9) 5 inch with (4) #1000 AL conductors

    Change is (10) 4 inch with (4) #900AL conductors
    Last Updated: 2019-07-04 05:02:51 UTC
    60 Elect-Concrete Encased Electrode (Ufer)
    Approved

    Inspector's Comments

    Mar 21, 2019
    Date: 3/21/2019

    Tied broken original UFER together under interior slab near original 1200A service equipment
    Last Updated: 2019-07-04 05:02:52 UTC
    67 Elect-Temp Power-SMUD
    Approved

    History:
    Apr 22, 2019
    Correction Notice
    May 3, 2019
    Approved

    Inspector's Comments

    Apr 22, 2019
    Date: 4/22/2019

    Upon removal of the Existing SMUD transformer directly in front of the new 500kVa transformer and the new 1200A 277/480V DPL disconnect, install a flat and level housekeeping pad extension to maintain a minimum 42 inch by as wide as the disconnect level surface in front of the equipment per NEC Art 110-26.



    As it stands presently, there is a 6 inch high by approximately 18-20 inches wide gap between the new housekeeping pad under and in front of the DPL disconnect, and the adjacent SMUD precast transformer pad, causing an uneven surface in the minimum working clearance area directly in front of the DPL disconnect.



    Inspector:

    John Briel

    (916)718-7260

    May 3, 2019
    Date: 5/3/2019

    NEW COMMERCIAL SERVICE UPGRADE



    4000A 277/480V MAIN UNDERGROUND SERVICE



    50A 277/480V HOUSE METER RELEASE



    600A 277/480V PANEL DPL METER RELEASE
    Last Updated: 2019-07-04 05:02:52 UTC
    79 Elect FINAL
    Approved

    History:
    May 3, 2019
    Cancelled
    Jun 28, 2019
    Scheduled
    Jun 28, 2019
    Inspector Overloaded - rescheduled for next business day
    Jul 3, 2019
    Approved
    Last Updated: 2019-07-04 05:02:52 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1821704
    2" Backflow Device (Commercial Remodel)

    Finaled
    Description:
    EXPEDITED - Add 2" backflow device to existing meter, on site work only.
    Last Updated: Nov 8, 2018

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    59 Plmg FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Plan: #Z18-183
    8671 Elder Creek Road - Commercial Condominium (Z Files)

    Approved
    Description:
    Tentative Parcel Map to subdivide one 4.37-acre lot, with an existing 64,740 square foot building, into a lot for commercial condominium purposes (20 airspace lots), in the Heavy Industrial Zone (M-2S). Site Plan & Design Review with deviations to reduce the required front and street-side setbacks (from 25'-0" to not less than 12’-6").
    Attachments:

    Signed MM Report _Z18-119

    Download Failed

    Z17-193_ROD

    Download Failed

    Z18-183_APP

    Download Failed

    Z18-183_PLANS-Exhibits-24x36

    Download Failed

    Z18-183_PLANS-TM-signed

    Download Failed

    Z18-183_ROD-Action-ZA-DD

    Download Failed

    Z18-183_ROUTING-form

    Download Failed

    Z18-183_SUPP-photos

    Download Failed


    Contact:
    Robert W. Williams
    916-808-7686
    Last Updated: Oct 31, 2018
    Application Submittal
    Ready for Review

    Comments

    Aug 29, 2018
    Placed in cart
    Last Updated: 2018-08-31 05:18:52 UTC
    Zoning Review
    Staff Report
    Due Date: Oct 25, 2018

    History:
    Nov 7, 2018
    SRC Meeting
    Nov 13, 2018
    Hearing Scheduled
    Nov 15, 2018
    Site Posted
    Nov 27, 2018
    Staff Report
    Nov 29, 2018
    Approved
    Nov 29, 2018
    Hearing
    Dec 7, 2018
    Staff Report

    Plan Review Comments

    Nov 29, 2018
    Action of the Zoning Administrator & Design Director: Project approved subject to conditions and based on findings of fact.

    Nov 29, 2018
    Action of the Zoning Administrator & Design Director: Project approved subject to conditions and based on findings of fact.
    Last Updated: 2018-12-20 05:20:04 UTC
    to receive an email alert when the next activity occurs
  • Plan: #Z18-119
    Add Mfg and Distribution of Cannabis to approved CUP for Cannabis Cultivation (Z Files)

    Approved
    Description:
    Minor Modification - A Request to add the use of Cannabis Manufacture and Distribution to approved (Z17-193) Cannabis Cultivation Use in existing buildings in M2-S zone in Council District 6. (Applicant has been advised there is high potential for request denial based on over-concentration of Cannabis uses in Council District 6.)
    Attachments:

    Z18-119 CUP App

    Download Failed

    Z18-119 Neighborhood Agreement

    Download Failed

    Z18-119 Supp Info

    Download Failed

    Z18-119_Minor Modification

    Download Failed

    Z18-119_PR SHEET

    Download Failed


    Contact:
    Kevin Valente
    916-372-6100
    Last Updated: May 10, 2018
    Application Submittal
    Ready for Review

    Comments

    May 2, 2018
    Applicant, Kevin Carmichael was advised project may likely be denied due to over-concentration of Cannabis projects in District 6. He opted to submit the application. The file has been delivered to ZA Cannabis In-Box.
    Last Updated: 2018-05-04 05:23:27 UTC
    Zoning Review
    Approved
    to receive an email alert when the next activity occurs
  • Plan: #Z17-193
    8671 Elder Creek Cultivation (Z Files)

    Approved
    Description:
    A request for cannabis cultivation in a space of approximately 36,488 square feet within an existing ±64,413-square foot warehouse on a ±4.37-acres lot in the Heavy Industrial (M-2S) zone. The existing building is divided into three separate commercial spaces. The remaining of the building is not included in this application. There are no proposed exterior modifications or changes to the site. Existing site improvements, parking, and landscaping will remain. The project requires a Conditional Use Permit (CUP) for cannabis cultivation.
    Attachments:

    Final SIgned NRP

    Download Failed

    Z17-193_APP

    Download Failed

    Z17-193_PLANS

    Download Failed

    Z17-193_ROD

    Download Failed

    Z17-193_SUPP

    Download Failed


    Contact:
    Miriam Lim
    916-808-3540
    Last Updated: Jan 17, 2018
    Application Submittal
    Ready for Review

    Comments

    Oct 2, 2017
    Delivered to Zoning Administrator inbox.
    Last Updated: 2017-10-17 05:15:47 UTC
    Zoning Review
    Approved

    History:
    Oct 16, 2017
    Withdrawn
    Oct 24, 2017
    Email
    Jan 12, 2018
    Email
    Jan 19, 2018
    Site Posted
    Feb 1, 2018
    Hearing
    Feb 13, 2018
    Approved

    Plan Review Comments

    Oct 24, 2017
    Introduction email and request for information sent to applicant.

    Jan 12, 2018
    Status Letter with comments sent to applicant.

    Jan 19, 2018
    Affidavit of Posting and site photos uploaded in Accela.

    Feb 13, 2018
    The appeal period ends on Friday, February 23 at 4pm.
    Last Updated: 2018-02-15 05:22:21 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1505034
    Commercial Reroof

    Finaled
    Description:
    Tear Off - No, Resheet - No, 1 layer(s), 300 squares of Hot Mop w/Cap Sheet. In-progress inspection required if 10 squares or greater.
    Last Updated: Apr 20, 2015
    Application Submitted
    Approved Over the Counter

    Inspection

    83 Bldg-Roof In Progress
    Approved

    Inspector's Comments

    Jun 1, 2015
    Last Updated: 2015-06-01 08:50:33 UTC
    29 Bldg FINAL
    Approved

    Inspector's Comments

    Jul 15, 2015
    Last Updated: 2015-07-15 08:36:18 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1408596
    Commercial Minor

    Finaled
    Description:
    PARTIAL REROOF OVERLAY ONE LAYER TORCHDOWN. 400 SQUARES
    Last Updated: Jul 14, 2014
    Tech Review
    Ready-to-Issue

    Inspection

    83 Bldg-Roof In Progress
    Approved
    29 Bldg FINAL
    Approved

    Inspector's Comments

    Nov 3, 2014
    Last Updated: 2014-11-03 10:35:25 UTC
    to receive an email alert when the next activity occurs
  • Permit: #0502565
    Building/Commercial/Repair-Maintenance/Industrial

    Expired
    Description:
    UPGRADE 100AMP ELEC PANEL TO 400AMP ELEC PANEL
    Last Updated: Feb 24, 2005
    to receive an email alert when the next activity occurs
  • Permit: #V9898
    Building/Archive/Archive/Retail Store

    Closed
    Description:
    Commercial interior remodel
    Last Updated: Nov 2, 1990
    to receive an email alert when the next activity occurs
  • Permit: #N11288
    Building/Archive/Archive/Industrial

    Closed
    Description:
    Overhead fire sprinklers