All
50
Building Permits
48
Planning
2
  • Plan: #P18-077
    North Natomas Arena Reuse Project (P Files)

    In Progress
    Description:
    Applicant is requesting entitlements required to redevelop the 183± acre former arena site in North Natomas. The site is zoned Sports Complex (SPX-PUD) and is located in the Capital Gateway Sports Complex Planned Unit Development (PUD) area. Requested entitlements include a Development Agreement; new PUD Guidelines; establishing a Special Planning District (SPD); a General Plan Amendment from Urban Center High to Urban Center Low; rezoning the property from Sports Complex (SPX-PUD-SPD) to General Commercial (C-2-PUD-SPD); and a Master Parcel Tentative Map.
    Attachments:

    P18-077_APP

    Download Failed

    P18-077_PLANS

    Download Failed

    P18-077_PUD-Guidelines

    Download Failed

    P18-077_SUPP

    Download Failed


    Contact:
    Teresa Haenggi
    (916) 808-7554
    Last Updated: Sep 23, 2019
    Application Submittal
    Ready for Review
    Planning Review
    Site Visit
    Due Date: May 20, 2019

    History:
    Feb 26, 2018
    Meeting with Applicant
    Nov 13, 2018
    Internal Review/Meeting
    Nov 15, 2018
    Internal Review/Meeting
    Nov 15, 2018
    Note
    Nov 20, 2018
    In Progress
    Nov 21, 2018
    Internal Review/Meeting
    Dec 3, 2018
    Internal Review/Meeting
    Dec 4, 2018
    Internal Review/Meeting
    Dec 6, 2018
    Internal Review/Meeting
    Dec 7, 2018
    Internal Review/Meeting
    Dec 7, 2018
    Note
    Dec 11, 2018
    Email
    Dec 12, 2018
    Internal Review/Meeting
    Dec 18, 2018
    Email
    Dec 19, 2018
    Email
    Dec 19, 2018
    Meeting with Applicant
    Dec 20, 2018
    Email
    Jan 2, 2019
    Internal Review/Meeting
    Jan 7, 2019
    Email
    Jan 11, 2019
    Waiting
    Jan 11, 2019
    Note
    Jan 11, 2019
    Internal Review/Meeting
    Jan 17, 2019
    Internal Review/Meeting
    Jan 18, 2019
    Note
    Jan 23, 2019
    Internal Review/Meeting
    Jan 23, 2019
    Meeting with Applicant
    Jan 24, 2019
    Note
    Jan 25, 2019
    Internal Review/Meeting
    Jan 25, 2019
    In Progress
    Jan 25, 2019
    Note
    Feb 5, 2019
    Meeting with Applicant
    Feb 7, 2019
    Internal Review/Meeting
    Feb 13, 2019
    Note
    Feb 24, 2019
    Internal Review/Meeting
    Feb 28, 2019
    Email
    Mar 6, 2019
    Internal Review/Meeting
    Mar 12, 2019
    Meeting with Applicant
    Mar 21, 2019
    Workshop/Meetings
    Apr 4, 2019
    Note
    Jun 6, 2019
    Email
    Jun 6, 2019
    Note
    Jun 21, 2019
    Internal Review/Meeting
    Jun 21, 2019
    Meeting with Applicant
    Jul 11, 2019
    Internal Review/Meeting
    Jul 16, 2019
    Meeting with Applicant
    Aug 19, 2019
    Meeting with Applicant
    Aug 19, 2019
    Site Visit

    Plan Review Comments

    Feb 26, 2018
    Weekly meeting with applicant team and city staff.

    Nov 13, 2018
    Initial review of application submitted on 11/9/18.

    Nov 15, 2018
    Month of November: responded to e-mails and calls related to the project.

    Nov 15, 2018
    emails, review submitted application materials

    Nov 21, 2018
    e-mail, phone call to applicant about letter of agency

    Dec 3, 2018
    Worked on letter of completeness

    Dec 4, 2018
    Worked on letter of completeness

    Dec 6, 2018
    Worked on letter of completeness

    Dec 7, 2018
    Finalized and sent the letter of completeness and sent/received subsequent e-mails related to letter.

    Dec 7, 2018
    review applicant letter

    Dec 12, 2018
    Met with Michael Jasso and CDD staff to discuss project.

    Dec 18, 2018
    e-mail

    Dec 19, 2018
    e-mail

    Jan 2, 2019
    internal staff meeting

    Jan 11, 2019
    Staff is still waiting for letter of agency. Cannot route until signed Letter of Agency is received.

    Jan 11, 2019
    Staff is still waiting for letter of agency. Cannot route until signed Letter of Agency is received.

    Jan 11, 2019
    Assigned to and discussed with Planner, Garrett Norman

    Jan 17, 2019
    Discussions related to project ownership.

    Jan 18, 2019
    email, CEQA discussion

    Jan 23, 2019
    Reviewed project routing packet (1/24)

    Jan 23, 2019
    Met with applicant team to discuss scope of traffice study.

    Jan 24, 2019
    review project routing

    Jan 25, 2019
    Meeting with application on CEQA document.

    Jan 25, 2019
    Application routed on 1/24/19 for public review.

    Feb 5, 2019
    Weekly meeting with applicant team and city staff. Discussed PUD Schematic Paln and Guidelines.

    Feb 13, 2019
    review project letter

    Feb 24, 2019
    Worked with planner on comment letter.

    Mar 6, 2019
    Met with long range planning to dicuss policies related to project.

    Mar 12, 2019
    Weekly meeting with applicant team and city staff.

    Mar 21, 2019
    Environmental EIR scoping meeting

    Apr 4, 2019
    SACOG letter

    Jun 6, 2019
    Emails with applicant team.

    Jun 6, 2019
    Review of planning application

    Jun 21, 2019
    Worked on letter of completeness

    Jun 21, 2019
    Weekly meeting with applicant team and city staff. Discussed PUD Schematic Plan and Guidelines.

    Jul 11, 2019
    Met with Public Works to discuss cross section, Phase I of the environmental, and to prep for 7/16 meeting with applicant.

    Jul 16, 2019
    Met with Public Works and applicant team to discuss cross sections. Includes meeting preparation.

    Aug 19, 2019
    met with applicant team (ESA, Pioneer) and Dylan Wood of State Dept. of Fish and Wildlife to discuss Rookeries.
    Last Updated: 2019-10-15 05:15:04 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1814775
    Cell Tower (Commercial Remodel)

    Finaled
    Description:
    swapping (3) new antennas with (3) existing antennas. removing (3) existing radios
    Last Updated: Jan 24, 2020

    Review

    Electrical Review
    Cycle 1 Approved
    Review Begin
    Cycle 3 Begin

    History:
    Aug 1, 2018
    Cycle 1 Begin
    Sep 4, 2018
    Cycle 2 Begin
    Nov 14, 2018
    Cycle 3 Begin
    Last Updated: 2018-11-20 05:05:24 UTC
    Structural Review
    Cycle 3 Approved

    History:
    Aug 14, 2018
    Cycle 1 Correction
    Sep 7, 2018
    Cycle 2 Correction
    Nov 19, 2018
    Cycle 3 Approved
    Last Updated: 2018-11-21 05:07:31 UTC
    Formal Review
    Approved

    Plan Review Comments

    Nov 19, 2018
    Formal Review Subtasks Complete - Script2
    Last Updated: 2018-11-21 05:07:32 UTC

    Permit Issuance

    Processing Permit
    Waiting on applicant to provide info or docs (Process Wait)
    Due Date: Nov 21, 2018
    Processing Permit
    Application Expired
    Due Date: Nov 21, 2018

    Comments

    May 20, 2019
    Task completed by batch script BuildingApplicationExpiration
    Last Updated: 2019-05-21 05:02:47 UTC
    Processing Permit
    Ready-to-Issue

    Comments

    Jul 9, 2019
    All Fees Paid-Needs to be flipped to Issued when customer comes in to PU
    Last Updated: 2019-07-16 05:01:44 UTC
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Permit Expired
    Due Date: Jul 15, 2019

    Comments

    Jan 12, 2020
    Task completed by batch script BuildingPermitExpiration
    Last Updated: 2020-01-13 05:02:04 UTC
    Issued
    Finaled

    Inspection

    29 Bldg FINAL
    Approved

    History:
    Jan 23, 2020
    Cancelled
    Jan 23, 2020
    Scheduled
    Jan 23, 2020
    Correction Notice
    Jan 24, 2020
    Approved

    Inspector's Comments

    Jan 23, 2020
    1) Provide inspection final approved from electrical inspection discipline

    2) Per application documents, special inspection not required for use of original pipe mounts. No new pipe mounts were added. Only antenna brackets were changed.

    3) No structural correction for this inspection.
    Last Updated: 2020-01-25 05:02:18 UTC
    79 Elect FINAL
    Approved

    History:
    Jan 23, 2020
    Cancelled
    Jan 23, 2020
    Scheduled
    Jan 24, 2020
    Approved
    Last Updated: 2020-01-25 05:02:18 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1719101
    ANSUL FIRE SUPPRESSION (Commercial Fire Equipment)

    Expired Permit
    Description:
    SECTION 219/220 ANSUL FIRE SUPPRESSION SYSTEM UPDATE
    Last Updated: Oct 20, 2017

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Comments

    Oct 20, 2017
    Permit not Finaled appropriately. Corrected by the script. May have expired inappropriately.
    Last Updated: 2019-01-18 06:01:34 UTC
    Issued
    Permit Expired
    Due Date: Oct 16, 2017

    Comments

    Apr 19, 2018
    Task completed by batch script BuildingPermitExpiration
    Last Updated: 2018-04-20 05:03:40 UTC

    Inspection

    194 Fire FINAL
    Approved

    History:
    Oct 17, 2017
    Scheduled
    Oct 20, 2017
    Approved
    Last Updated: 2018-04-20 05:03:40 UTC
    200.1Fire Sprinkler - Overhead Visual
    Approved

    History:
    Oct 17, 2017
    Scheduled
    Oct 20, 2017
    Approved
    Last Updated: 2018-04-20 05:03:41 UTC
    311 Kitchen Hood System
    Approved

    History:
    Oct 17, 2017
    Scheduled
    Oct 20, 2017
    Approved
    Last Updated: 2018-04-20 05:03:41 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1515335
    Commercial Remodel

    Process Wait
    Description:
    Install new 100 amp sub panel dedicated to existing indoor communication equipment.
    Last Updated: Oct 29, 2015
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Electrical Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    Nov 17, 2015
    Formal Review Subtasks Complete - Script2
    Last Updated: 2015-11-17 13:51:11 UTC

    Permit Issuance

    Processing Permit
    Waiting on applicant to provide info or docs (Process Wait)
    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    63 Elect-Rough
    Approved
    79 Elect FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #COM-1510518
    Commercial Repair-Maintenance

    Expired Permit
    Description:
    EXPEDITED - Remove and replace circuit breaker, transformer, install 200 amp disconnect, remove and replace existing 100 amp sprint ppc.
    Last Updated: Aug 4, 2015
    Tech Review
    Approved Over the Counter

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Permit Expired

    Comments

    Feb 1, 2016
    Task completed by batch script BuildingPermitExpiration
    Last Updated: 2016-02-01 03:01:27 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1410961
    Commercial Remodel

    Finaled
    Description:
    EXPEDITED - INSTALL COLD THERAPY EQUIPMENT
    Last Updated: Sep 5, 2014
    Tech Review
    Approved Over the Counter

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Processing Permit
    Waiting on applicant to provide info or docs (Process Wait)

    Comments

    Sep 5, 2014
    waiting for reg san doc
    Last Updated: 2016-12-12 01:07:20 UTC
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    79 Elect FINAL
    Approved
    29 Bldg FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #COM-1407465
    Commercial Remodel

    Issued
    Description:
    INSTALL 3 ADDITIONAL ANTENNAS, 4 NEW BATTERIES, 1 NEW HYBRED CABLE & 3 NEW RRH'S
    Last Updated: Jun 19, 2014
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Fire Review
    Cycle 1 Approved
    Electrical Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    Jul 3, 2014
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-23 05:02:45 UTC
    Structural Review
    Cycle 1 Approved

    Permit Issuance

    Processing Permit
    Waiting on applicant to provide info or docs (Process Wait)
    Ready To Issue
    Permit Issued; applicant can begin work

    Comments

    Nov 6, 2014
    Last Updated: 2016-12-12 04:16:49 UTC
    Processing Permit
    Ready-to-Issue

    Comments

    Nov 6, 2014
    Last Updated: 2016-12-12 04:16:49 UTC
    Issued
    Permit Extended-180 Days

    Comments

    Apr 8, 2015
    See attached request letter
    Last Updated: 2015-04-08 11:25:35 UTC
    Issued
    Finaled

    Inspection

    500 Cell Tower
    Approved

    Inspector's Comments

    May 19, 2015
    Last Updated: 2015-05-19 13:44:32 UTC
    194 Fire FINAL
    Approved

    Inspector's Comments

    May 19, 2015
    Last Updated: 2015-05-19 13:44:48 UTC
    79 Elect FINAL
    Approved

    Inspector's Comments

    May 21, 2015
    Last Updated: 2015-05-21 10:09:04 UTC
    29 Bldg FINAL
    Approved

    History:
    May 7, 2015
    Cancelled
    May 21, 2015
    Cancelled
    May 21, 2015
    Cancelled
    May 21, 2015
    Approved

    Inspector's Comments

    May 7, 2015

    May 21, 2015
    rescheduled to John Briel

    May 21, 2015
    rescheduled to John Briel

    May 21, 2015
    OK per M. Johnson
    Last Updated: 2015-05-21 10:09:37 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1314168
    Commercial Revision

    Complete
    Description:
    Revision to COM-1309945: Revised Architectual sheets
    Last Updated: Nov 26, 2013
    Tech Review
    Approved Over the Counter

    Comments

    Nov 26, 2013
    Reviewed and approved by Jay Griffin. 4 hours total
    Last Updated: 2014-10-24 03:22:42 UTC

    Permit Issuance

    Processing Permit
    Ready For Pickup
    Ready For Pickup
    Complete
    to receive an email alert when the next activity occurs
  • Permit: #COM-1313838
    Commercial Remodel

    Expired Permit
    Description:
    MODIFICATION TO EXISITNG TELECOMM INSTALLATION CONSISTING OF THE FOLLOWING: INSTALLNEW CABINETS, REMOVE EXISTING, INSTALL NEW ANTENNAS, REMOVE EXISTING. ADD NEW REMOTE RADIO UNITS AND GPS ANTENNA AND CABLING.
    Last Updated: Nov 18, 2013
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Fire Review
    Cycle 1 Approved
    Life Safety Review
    Cycle 1 Approved
    Electrical Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    Dec 6, 2013
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-24 02:29:21 UTC
    Structural Review
    Cycle 1 Approved

    Permit Issuance

    Processing Permit
    Waiting on applicant to provide info or docs (Process Wait)
    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Permit Expired

    Comments

    Jul 8, 2014
    Task completed by batch script BuildingPermitExpiration
    Last Updated: 2016-12-12 01:44:01 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1309945
    Commercial Remodel

    Certificate of Compliance
    Description:
    EXPEDITED - remodel
    Last Updated: Aug 23, 2013
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Formal Review
    Approved

    Plan Review Comments

    Aug 26, 2013
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-24 03:17:35 UTC
    Structural Review
    Cycle 1 Approved
    Life Safety Review
    Cycle 1 Approved
    Mechanical Review
    Cycle 1 Approved
    Plumbing
    Cycle 1 Approved
    Electrical Review
    Cycle 1 Approved
    Fire Review
    Cycle 1 Approved
    Construction Debris Review
    Cycle 1 Approved

    Plan Review Comments

    Aug 26, 2013
    Waste Management Plan submitted.



    - Chris Thoma (916-808-4833, C&D@cityofsacramento.org)
    Last Updated: 2014-10-24 03:17:38 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Temporary Certificate of Occupancy Issued
    Issued
    Finaled

    Inspection

    40 Plmg-Underfloor/Slab
    Approved

    History:
    Sep 9, 2013
    Partially Approved
    Sep 11, 2013
    Approved

    Inspector's Comments

    Sep 9, 2013
    2013-09-09
    Robert S Bottino
    See sheet P2.1 (Visitor Locker Room & VIP Restroom)
    Last Updated: 2014-10-24 03:17:52 UTC
    200.2 Fire Sprinkler - Overhead Hydro
    Approved

    Inspector's Comments

    Sep 24, 2013
    2013-09-25
    Pablo Gomez
    Hydro passed.
    Last Updated: 2014-10-24 03:17:50 UTC
    41 Plmg-Top/Rough
    Approved

    History:
    Sep 17, 2013
    Partially Approved
    Sep 25, 2013
    Approved

    Inspector's Comments

    Sep 17, 2013
    2013-09-18
    Robert S Bottino
    See sheet P1.1...............VIP bathroom & Visitor Locker Room.
    Last Updated: 2014-10-24 03:17:50 UTC
    63 Elect-Rough
    Partially Approved

    Inspector's Comments

    Sep 26, 2013
    2013-09-26
    Fred Wagner
    WALLS, NO HARD LIDS, SEE NOTES ON E-3 & 4.
    Last Updated: 2014-10-24 03:17:50 UTC
    22 Bldg-Sheetrock Nailing
    Partially Approved

    History:
    Sep 24, 2013
    Partially Approved
    Sep 30, 2013
    Partially Approved

    Inspector's Comments

    Sep 24, 2013
    2013-09-24
    Paul W Clayton
    Contractor asked to one side rest rooms and was told that he can if he gets the approval of all other inspectors

    Sep 30, 2013
    2013-09-30
    Paul W Clayton
    Walls only
    Last Updated: 2014-10-24 03:17:49 UTC
    64 Elect-Rough (Walls Only)
    Approved

    History:
    Sep 23, 2013
    Partially Approved
    Sep 26, 2013
    Partially Approved
    Oct 1, 2013
    Approved

    Inspector's Comments

    Sep 23, 2013
    2013-09-23
    Fred Wagner
    SEE E-4

    Sep 26, 2013
    2013-09-26
    Fred Wagner
    WALLS, NO HARD LIDS, SEE NOTES ON E-3 & 4.

    Oct 1, 2013
    2013-10-01
    John B Briel
    SEE E-SHEETS
    Last Updated: 2014-10-24 03:17:49 UTC
    19 Bldg-Frame
    Approved

    History:
    Sep 23, 2013
    Correction Notice
    Sep 24, 2013
    Correction Notice
    Sep 25, 2013
    Correction Notice
    Oct 15, 2013
    Cancelled
    Oct 24, 2013
    Approved

    Inspector's Comments

    Sep 23, 2013
    2013-09-23
    Paul W Clayton
    Inspection for restroom area.

    1) Old full height walls now turned into hanging soffits which also support horizontal ceiling; provide detail for framing, as built does notappear to be subsatnatial enough to support ceiling and soffit.

    Sep 24, 2013
    2013-09-24
    Paul W Clayton
    Inspection for visitors locker room: Framing for support of what used to be a full height wall supporting ceiling joists and now is hanging soffit supporting celing appeared to be sufficient but architect must provide drawing and stamped approval of framing.

    Sep 25, 2013
    2013-09-25
    Paul W Clayton
    Throughout.

    1) Structural columns that never had required sprayed on fire proofing to have the product applied.

    2) Walls to be braced 48" on center per plan.

    3) Full height walls to be attched to deck 12" on center.

    4) Use framing SMS screw on 10" header attachment, 2 per stud.

    Note all changes/revisions to have wwet stamped architects drawing,.

    Oct 15, 2013
    2013-10-15
    Josh Pino
    Cancel as per contractors request.
    Last Updated: 2014-10-24 03:17:47 UTC
    21 Bldg-Frame Ceiling (T-Bar)
    Approved

    History:
    Oct 10, 2013
    Correction Notice
    Oct 24, 2013
    Approved

    Inspector's Comments

    Oct 10, 2013
    2013-10-10
    Josh Pino
    1. Provide a revised plan showing new T-Bar area in visitors locker room.

    2. Provide rivoting and clips as per ASTM STD for suspended ceilings.

    3. Provide missing clips for lights to T-Bar opposite wire supports.

    4. O.K. to drop filed tiles only with others approval. No perimiter tiles until anchoring cited above is verified.
    Last Updated: 2014-10-24 03:17:47 UTC
    65 Elect-Rough (Ceiling Only)
    Partially Approved

    History:
    Oct 1, 2013
    Partially Approved
    Oct 24, 2013
    Partially Approved
    Oct 25, 2013
    Partially Approved

    Inspector's Comments

    Oct 1, 2013
    2013-10-01
    John B Briel
    SEE E-SHEETS

    Oct 24, 2013
    2013-10-24
    Fred Wagner
    SEE LIGHTING PLANS

    Oct 25, 2013
    2013-10-25
    Fred Wagner
    REMAINING MEDIA CEILING
    Last Updated: 2014-10-24 03:17:46 UTC
    31 Mech-Top/Rough
    Approved

    History:
    Sep 23, 2013
    Partially Approved
    Oct 25, 2013
    Correction Notice
    Oct 28, 2013
    Approved

    Inspector's Comments

    Sep 23, 2013
    2013-09-23
    Robert S Bottino
    See sheet M2.0.2

    Oct 25, 2013
    2013-10-25
    Robert S Bottino
    1) Complete all register installations in all areas.................

    2) Air balance report required for final occupancy.....................
    Last Updated: 2014-10-24 03:17:45 UTC
    59 Plmg FINAL
    Approved

    History:
    Oct 10, 2013
    Correction Notice
    Oct 25, 2013
    Correction Notice
    Oct 28, 2013
    Approved

    Inspector's Comments

    Oct 10, 2013
    2013-10-10
    Robert S Bottino
    1) Visitors locker room, meeting room, and restroom, partial approval for Temp C of O only. See sheet P2.1 and sheet M2.0.1.....................

    2) All other areas are currently under construction, and not approved for occupancy.....................

    3) Insulate P-traps and hot water lines at the existing lavitories in the Visitors restroom area...................

    4) A complete air balance report is required for final occupancy................

    Oct 25, 2013
    2013-10-25
    Robert S Bottino
    1) Install food service equipment ( Soda & Ice) for final occupancy...................

    2) Insulate P-traps and hot water lines in all restrooms..............
    Last Updated: 2014-10-24 03:17:44 UTC
    100 Fire Alarm System
    Approved

    Inspector's Comments

    Oct 28, 2013
    2013-10-23
    Marty Hill
    Alarm test passed all devices installed properly.
    Last Updated: 2014-10-24 03:17:47 UTC
    200.1Fire Sprinkler - Overhead Visual
    Approved

    History:
    Sep 24, 2013
    Partially Approved
    Oct 28, 2013
    Correction Notice
    Oct 28, 2013
    Approved

    Inspector's Comments

    Sep 24, 2013
    2013-09-25
    Pablo Gomez
    Visual was just a partial as marked on plans. On site.

    Oct 28, 2013
    2013-10-23
    Marty Hill
    Flex drops not approved for more than 2 bends need to replace

    Oct 28, 2013
    2013-10-28
    Marty Hill
    All flex drops replaced with proper parts sprinkler system passed.
    Last Updated: 2014-10-24 03:17:46 UTC
    207 Fire Extinguishers
    Not Ready
    39 Mech FINAL
    Approved

    History:
    Oct 10, 2013
    Correction Notice
    Oct 25, 2013
    Correction Notice
    Oct 28, 2013
    Correction Notice
    Oct 29, 2013
    Approved

    Inspector's Comments

    Oct 10, 2013
    2013-10-10
    Robert S Bottino
    1) Visitors locker room, meeting room, and restroom, partial approval for Temp C of O only. See sheet P2.1 and sheet M2.0.1.....................

    2) All other areas are currently under construction, and not approved for occupancy.....................

    3) Insulate P-traps and hot water lines at the existing lavitories in the Visitors restroom area...................

    4) A complete air balance report is required for final occupancy................

    Oct 25, 2013
    2013-10-25
    Robert S Bottino
    1) Complete all register installations in all areas.................

    2) Air balance report required for final occupancy.....................

    Oct 28, 2013
    2013-10-28
    Robert S Bottino
    Provide air balance report for final occupancy.

    Oct 29, 2013
    2013-10-29
    Robert S Bottino
    Recieved air balance report.
    Last Updated: 2014-10-24 03:17:44 UTC
    100.1 Battery Test
    Approved

    History:
    Oct 28, 2013
    Not Ready
    Oct 28, 2013
    Correction Notice
    Oct 30, 2013
    Approved

    Inspector's Comments

    Oct 28, 2013
    2013-10-23
    Marty Hill
    Not ready for the battery test.

    Oct 28, 2013
    2013-10-28
    Marty Hill
    Batterys failed to be retested 10/29/13

    Oct 30, 2013
    2013-10-29
    Marty Hill
    Approved per Jason Lee
    Last Updated: 2014-10-24 03:17:44 UTC
    194 Fire FINAL
    Approved

    History:
    Oct 28, 2013
    Correction Notice
    Oct 30, 2013
    Approved

    Inspector's Comments

    Oct 28, 2013
    2013-10-28
    Marty Hill
    Alarm batteries failed no final today.

    Oct 30, 2013
    2013-10-29
    Marty Hill
    Approved
    Last Updated: 2014-10-24 03:17:44 UTC
    29 Bldg FINAL
    Approved

    History:
    Oct 11, 2013
    Correction Notice
    Oct 28, 2013
    Correction Notice
    Oct 29, 2013
    Inspector Provided Info (no inspection)
    Oct 30, 2013
    Correction Notice
    Nov 27, 2013
    Approved

    Inspector's Comments

    Oct 11, 2013
    2013-10-11
    Paul W Clayton
    Inspection for visitor's locker room only.

    1) Complete repairs to t-bar per previous C.N.

    Ok to apply for TCO for visitor's locker room only with all other inspections approval.

    Bring to the counter all written approvals and apply for this TCO

    Oct 28, 2013
    2013-10-28
    Josh Pino
    1. Provide missing "EXIT" & EXIT ROUTE" signage.

    2. Wrap H/C lines under lavatories.

    3. Remove exit signage leading to warehouse @ rear of room #112.

    4.Provide missing lighted exit sign @ visitor's locker room.

    5. Post occupant load as issued by the fire marshal for all assembly areas.

    6. Obtain all required final approvals.

    7. Provide a revised plans showing altered room adjacent to media room.

    8. Submit a revised plans showing path of travel from remodeled/altered areas indicating required lighted exit signage, striping, emergency lighting and tactile signage.

    9. O.K. to issue TCO once exiting issues are resolved w/ others approval.

    Oct 29, 2013
    2013-10-29
    Paul W Clayton
    Walk through with Ryan Devore and Brown Construction people ( Jerry) pin pointing location of illuminated exit signs.

    Also stated requirement for TCO contingent upon fire approval, completing demarcation line in fron of door at north exit from VIP room and demarcation to second exit from VIP through man door at north west roll up door..Architect to follow through with revised egress plan that clarify's exiting.

    Oct 30, 2013
    2013-10-30
    Paul W Clayton
    Ok to apply for TCO with other inspection approvals.

    1) Replace temporary maximum occupancy signs with permament identification signs.

    2) Submit to City of Sacramento plan review all revisions and clarification drawings for egress and occupancy and any room changes.
    Last Updated: 2014-10-24 03:17:43 UTC
    79 Elect FINAL
    Approved

    History:
    Oct 10, 2013
    Inspector Overloaded - rescheduled for next business day
    Oct 11, 2013
    Partially Approved
    Oct 11, 2013
    Partially Approved
    Oct 28, 2013
    Not Ready
    Nov 1, 2013
    Cancelled
    Nov 27, 2013
    Approved

    Inspector's Comments

    Oct 11, 2013
    2013-10-11
    Fred Wagner
    N.E . PORTION OF VISITOR LOCKER ROOM IN S.E. QUAD. SEE CEILING PLAN.

    Oct 11, 2013
    2013-10-11
    Fred Wagner
    N.E . PORTION OF VISITOR LOCKER ROOM IN S.E. QUAD. SEE CEILING PLAN. OK TO APPLY FOR PARTIAL TCO.

    Oct 28, 2013
    2013-10-28
    Fred Wagner
    PROVIDE LTG-2A, OPEN ALL PANELS FOR INSPECTION, GET REQUIRED PLAN REVISION FOR ADDED MEDIA ROOM. OK TO APPLY FOR TCO ELECTRICALLY.

    Nov 1, 2013
    2013-11-01
    Fred Wagner
    SPOKE WITH JERRY OF BROWN CONSTRUCTION REGARDING THE PLAN REVISION NOT BEING DONE AND EXIT SIGNAGE NEEDS TO BE IN A REVISION AS WELL. HE WILL GET ON IT.
    Last Updated: 2014-10-24 03:17:43 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1205600
    Commercial Remodel

    Expired Permit
    Description:
    Remove copper communications cabeling & replace with fiber optics
    Last Updated: Jun 12, 2012
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Fire Review
    Cycle 1 Approved
    Electrical Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    Jul 5, 2012
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-24 04:36:31 UTC
    Structural Review
    Cycle 1 Approved
    Life Safety Review
    Cycle 1 Approved

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Processing Permit
    Note

    Comments

    Jul 9, 2012
    DO NOT ISSUE FEMA REVIEW REQD condition exists. This site is in a Flood Zone. Please obtain supervisor approval before continuing.
    Last Updated: 2016-12-12 01:54:14 UTC
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Permit Expired

    Comments

    Jan 15, 2013
    Task completed by batch script BuildingPermitExpiration
    Last Updated: 2016-12-12 01:54:15 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1203711
    Commercial Remodel

    Expired Permit
    Description:
    400 sqft interior non-structural remodel: Add wall to enclose a telecommuniction equipment room, add a 2.5 ton HVAC system with associated electrical work per plan.
    Last Updated: Apr 20, 2012
    Tech Review
    Approved Over the Counter

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Permit Expired

    Comments

    Jan 6, 2013
    Task completed by batch script BuildingPermitExpiration
    Last Updated: 2016-12-12 01:26:34 UTC

    Inspection

    88 Bldg-Accessible Access
    Cancelled

    Inspector's Comments

    May 10, 2012
    2012-05-10
    Michael C Wilhelm
    wrong call
    Last Updated: 2014-10-23 22:56:41 UTC
    22 Bldg-Sheetrock Nailing
    Approved
    19 Bldg-Frame
    Approved
    79 Elect FINAL
    Approved

    History:
    May 25, 2012
    Rescheduled
    May 25, 2012
    Cancelled
    May 29, 2012
    Correction Notice
    May 30, 2012
    Inspector Overloaded - rescheduled for next business day
    May 31, 2012
    Cancelled
    May 31, 2012
    Approved

    Inspector's Comments

    May 25, 2012
    2012-05-25
    Fred Wagner
    contact cancelled on computer

    May 29, 2012
    2012-05-29
    Fred Wagner
    1. COMPLETE XFMR MOUNTING.

    2. PROVIDE GROUNDING ELECTRODE CONDUCTOR TO BUILDING STEEL.

    3. PROVIDE BOND BUSHINGS AT FLEX CONNECTIONS TO XFMR CASE.

    4. LABEL CIRCUIT BREAKERS AND DISCONNECTS.

    5. MAKE CORRECTIONS AND RECALL.

    May 31, 2012
    2012-05-31
    Fred Wagner
    DUPLICATE
    Last Updated: 2014-10-23 22:56:40 UTC
    39 Mech FINAL
    Approved

    History:
    Jun 20, 2012
    Correction Notice
    Jun 28, 2012
    Correction Notice
    Jul 6, 2012
    Cancelled
    Jul 9, 2012
    Approved

    Inspector's Comments

    Jun 20, 2012
    2012-06-20
    Richard D Heins
    west lounge area-

    1. fc1 and fc2- drawings indicate 2250 cfm on each unit and drawings indicaste the requirement for smoke detection and when detected the units are to shut down through automatic controls. Provide as indicated by approved drawings.

    2. install a filter in each unit in the rack beneath each FC unit.

    3. properly support the condensation drainage materials.

    Jun 28, 2012
    2012-06-28
    Richard D Heins
    detector did not turn off the fan units. correct as noted

    Jul 6, 2012
    2012-07-06
    Thomas H Kervin
    #39 MECH-FINAL,CANCEL,NO PHONE ANSWER,

    NO SUCH STREET,
    Last Updated: 2014-10-23 22:56:39 UTC
    29 Bldg FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #COM-1108366
    Commercial Remodel

    Finaled
    Description:
    @ NORTHEAST CORNER OF "MECHANICAL LEVEL": REPLACING 2 EQUPMENT CABINETS AND ADDING 6 NEW INDOOR ANTENNAS
    Last Updated: Aug 23, 2011
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Fire Review
    Cycle 1 Approved

    Plan Review Comments

    Aug 26, 2011
    Approved, no field inspection required
    Last Updated: 2014-10-24 21:00:25 UTC
    Electrical Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    Sep 8, 2011
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-24 21:00:20 UTC
    Structural Review
    Cycle 1 Approved
    Life Safety Review
    Cycle 1 Approved

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    39 Mech FINAL
    Cancelled
    79 Elect FINAL
    Approved
    29 Bldg FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #COM-1102388
    Commercial Fire Equipment

    Expired Application
    Description:
    Gayloard quencher hood suppresion system at existing hood downstairs main kitchen.
    Last Updated: Mar 10, 2011
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Fire Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    Mar 17, 2011
    Formal Review Subtasks Complete - Script7
    Last Updated: 2014-10-24 21:05:58 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Application Expired

    Comments

    Sep 6, 2011
    Expired due to inactivity
    Last Updated: 2016-12-12 02:41:11 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1010526
    Commercial Remodel

    Finaled
    Description:
    INTERIOR REMODEL for new vendor, JIMBOY'S TACOS, in existing kitchen area - REPLACE cooking equipment with new; ADD electrical receptacles for new equipment.
    Last Updated: Oct 14, 2010
    Tech Review
    Triage Not Required

    Review

    Plumbing
    No Review Required
    Life Safety Review
    Cycle 2 Approved

    History:
    Oct 22, 2010
    Cycle 1 Correction
    Nov 2, 2010
    Cycle 2 Approved
    Last Updated: 2014-10-24 15:39:49 UTC
    Mechanical Review
    Cycle 2 Approved

    History:
    Oct 25, 2010
    Cycle 1 Correction
    Nov 2, 2010
    Cycle 2 Approved
    Last Updated: 2014-10-24 15:39:50 UTC
    Electrical Review
    Cycle 2 Approved

    History:
    Oct 25, 2010
    Cycle 1 Correction
    Nov 2, 2010
    Cycle 2 Approved
    Last Updated: 2014-10-24 15:39:50 UTC
    Review Begin
    Cycle 3 Begin

    History:
    Oct 14, 2010
    Cycle 1 Begin
    Nov 2, 2010
    Cycle 2 Begin
    Nov 16, 2010
    Cycle 3 Begin
    Last Updated: 2014-10-24 15:39:49 UTC
    Fire Review
    Cycle 3 Approved

    History:
    Oct 25, 2010
    Cycle 1 Correction
    Nov 8, 2010
    Cycle 2 Correction
    Dec 22, 2010
    Cycle 3 Approved
    Last Updated: 2014-10-24 15:39:51 UTC
    Formal Review
    Approved

    Plan Review Comments

    Dec 22, 2010
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-24 15:39:46 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Finaled

    Inspection

    65 Elect-Rough (Ceiling Only)
    Partially Approved

    Inspector's Comments

    Jan 31, 2011
    2011-01-31
    Fred Wagner
    1. CLARIFY THE 5 DELTA'S BY THE CONTRACTOR ON THE APPROVED SET. SUBMIT FOR APPROVAL IF NECESSARY. OK TO CONTINUE.
    Last Updated: 2014-10-24 15:39:56 UTC
    63 Elect-Rough
    Partially Approved

    Inspector's Comments

    Jan 31, 2011
    2011-01-31
    Fred Wagner
    1. CLARIFY THE 5 DELTA'S BY THE CONTRACTOR ON THE APPROVED SET. SUBMIT FOR APPROVAL IF NECESSARY. OK TO CONTINUE.
    Last Updated: 2014-10-24 15:39:56 UTC
    39 Mech FINAL
    Approved

    Inspector's Comments

    Mar 1, 2011
    2011-03-01
    Thomas H Kervin
    #39 MECH/FINAL,#59 PLMG/FINAL,AP.
    Last Updated: 2014-10-24 15:39:55 UTC
    59 Plmg FINAL
    Approved

    Inspector's Comments

    Mar 1, 2011
    2011-03-01
    Thomas H Kervin
    #39 MECH/FINAL,#59 PLMG/FINAL,AP.
    Last Updated: 2014-10-24 15:39:56 UTC
    311 Kitchen Hood System
    Approved

    Inspector's Comments

    Mar 2, 2011
    2011-03-02
    Elizabeth McDowell
    Kitchen hoos system tested and passed.
    Last Updated: 2014-10-24 15:39:55 UTC
    29 Bldg FINAL
    Approved

    History:
    Mar 1, 2011
    Correction Notice
    Mar 3, 2011
    Approved

    Inspector's Comments

    Mar 1, 2011
    2011-03-01
    Carey Boyd
    1. Provide 30 inch wide counter space at 34 inches above the floor

    2. Provide towel dispenser at 40 inches max.

    make corrections and recall for inspection
    Last Updated: 2014-10-24 15:39:54 UTC
    79 Elect FINAL
    Approved

    History:
    Mar 1, 2011
    Correction Notice
    Mar 3, 2011
    Approved

    Inspector's Comments

    Mar 1, 2011
    2011-03-01
    Fred Wagner
    1. PROVIDE LINE OF SIGHT DISCONNECT MEANS OR LOCKOUTS PER NEC-422
    Last Updated: 2014-10-24 15:39:54 UTC
    194 Fire FINAL
    Approved

    Inspector's Comments

    Mar 9, 2011
    2011-03-03
    Elizabeth McDowell
    Fire final passed. red folder signed
    Last Updated: 2014-10-24 15:39:54 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-1004016
    Commercial Remodel

    Expired Permit
    Description:
    Adding antennas & equipment cabinets (roof-top location)
    Last Updated: Apr 29, 2010
    Tech Review
    Triage Not Required

    Review

    Review Begin
    Cycle 1 Begin
    Fire Review
    Cycle 1 Approved
    Electrical Review
    Cycle 1 Approved
    Formal Review
    Approved

    Plan Review Comments

    May 13, 2010
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-24 17:38:41 UTC
    Structural Review
    Cycle 1 Approved
    Life Safety Review
    Cycle 1 Approved

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work
    Issued
    Permit Expired

    Comments

    Dec 23, 2010
    No finals, no inspections
    Last Updated: 2016-12-12 02:23:45 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-0910666
    Building/Commercial/Minor/Retail Store

    Finaled
    Description:
    REROOF. INSTALL SINGLE PLY ROOFING SYSTEM. DRY ROT REPAIR AND MINOR COSMETIC REPAIR.Kings practice building.
    Last Updated: Oct 2, 2009
    Tech Review
    Approved

    Inspection

    83 Bldg-Roof In Progress
    Approved

    History:
    Oct 21, 2009
    Approved
    Oct 22, 2009
    Cancelled
    Nov 12, 2009
    Approved

    Inspector's Comments

    Oct 22, 2009
    2009-10-22
    Steve E Bronson
    upper roof in progress already aproved yeaterday

    Nov 12, 2009
    2009-11-12
    Steve E Bronson
    Lower roof aproved upper roof in progress already aproved.
    Last Updated: 2014-10-25 14:04:03 UTC
    29 Bldg FINAL
    Approved

    History:
    Nov 12, 2009
    Cancelled
    Nov 17, 2009
    Approved

    Inspector's Comments

    Nov 12, 2009
    2009-11-12
    Steve E Bronson
    Wrong inspection
    Last Updated: 2014-10-25 14:04:02 UTC
    to receive an email alert when the next activity occurs
  • Plan: #Z09-157
    CA-SAC0534 - Nonexempt dish antennas on Arco Arena façade. (Z Files)

    Approved
    Description:
    A request for a Special Permit in order to install three (3) non-exempt antennas on the façade of an existing building, on a parcel of approximately 53.64 acres in the Sports Complex, Capital Gateway Sports Complex Planned Unit Development (SPX-PUD) zone.

    Contact:
    Robert W. Williams
    916-808-7686
    Last Updated: Sep 29, 2009
    Application Submittal
    Ready for Review
    Zoning Review
    Approved

    History:
    Oct 20, 2009
    Notice of Incompleteness
    Oct 21, 2009
    Waiting
    Dec 4, 2009
    In Progress
    Jan 20, 2010
    Hearing Scheduled
    Feb 4, 2010
    Approved

    Plan Review Comments

    Oct 20, 2009
    The minor modification application is invalid because there is no previous or deemed special permit for the existing antennas that can be modified. The existing panel antennas are exempt antennas, meaning they do not require a special permit for installation. The dish antennas that you are proposing are not exempt and require a special permit from the Zoning Administrator to be installed. Please submit 4 more sets of plans and fees of $7495.20 ($8251.20 - $756.00) so that this application can be processed as a special permit.

    Oct 21, 2009
    Minor Mod application is not valid. Project requires Zoning Adminstrator Special Permit.

    Dec 4, 2009
    Special Permit fees and plans received.

    Feb 4, 2010
    Approved subject to conditions and based on findings of fact.
    Last Updated: 2016-12-14 14:33:18 UTC
    Closure
    On Site Storage
    Due Date: Feb 16, 2011

    Comments

    Feb 22, 2010
    In Drawer
    Last Updated: 2016-12-14 14:33:19 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-0907880
    Building/Commercial/Tenant Improvement/Amusement

    Finaled
    Description:
    New electrical feed to yougurt machine's & portable hand sink
    Last Updated: Jul 24, 2009
    Tech Review
    Approved Over the Counter

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work

    Inspection

    79 Elect FINAL
    Approved

    History:
    Oct 8, 2009
    Inspector Overloaded - rescheduled for next business day
    Oct 9, 2009
    Correction Notice
    Oct 12, 2009
    Approved

    Inspector's Comments

    Oct 9, 2009
    2009-10-09
    Douglas J Pierson
    1. Install 2 pole circuit breakers on circuits # 7,9 and 8,10 due to two 120v circuits on the same strap/device.

    2. Provide proper clearance in front of transfomer disconnect.

    3. Properly bond transfomer and neutral and no double lugging allowed.

    4. Install circuit breaker in MSB with the same AIC rating as the other circuit breakers or provide Letter from SMUD of AIC rating.
    Last Updated: 2014-10-25 16:45:13 UTC
    to receive an email alert when the next activity occurs
  • Permit: #COM-0715365
    Building/Commercial/Tenant Improvement/Office

    Certificate of Occupancy
    Description:
    3762 SF OFFICE IN EXISTING STORAGE AREA
    Last Updated: Oct 4, 2007
    Tech Review
    Triage Not Required

    Review

    Mechanical Review
    Cycle 1 Approved
    Fire Review
    Cycle 1 Approved

    Plan Review Comments

    Oct 16, 2007
    red card for 200 & 207 w/envelope
    Last Updated: 2014-10-26 14:02:15 UTC
    Review Begin
    Cycle 2 Begin

    History:
    Oct 4, 2007
    Cycle 1 Begin
    Oct 25, 2007
    Cycle 2 Begin
    Last Updated: 2014-10-26 14:02:13 UTC
    Electrical Review
    Cycle 2 Approved

    History:
    Oct 18, 2007
    Cycle 1 Correction
    Oct 30, 2007
    Cycle 2 Approved
    Last Updated: 2014-10-26 14:02:17 UTC
    Structural Review
    Cycle 2 Approved

    History:
    Oct 18, 2007
    Cycle 1 Correction
    Nov 2, 2007
    Cycle 2 Approved

    Plan Review Comments

    Oct 18, 2007
    Comments e-mailed to Lan Linville at lanlinville@hotmail.com.
    Last Updated: 2014-10-26 14:02:15 UTC
    Life Safety Review
    Cycle 2 Approved

    History:
    Oct 10, 2007
    Cycle 1 Correction
    Nov 6, 2007
    Cycle 2 Approved

    Plan Review Comments

    Nov 6, 2007
    Approval after meeting with the applicant. The meeting included Bryon Nakashima. Approved as noted. The 4 hours represents the recheck, the meeting, and putting notes on the plans.
    Last Updated: 2014-10-26 14:02:16 UTC
    Formal Review
    Approved

    Plan Review Comments

    Nov 6, 2007
    Formal Review Subtasks Complete - Script2
    Last Updated: 2014-10-26 14:02:12 UTC

    Permit Issuance

    Processing Permit
    Ready-to-Issue
    Ready To Issue
    Permit Issued; applicant can begin work

    Inspection

    64 Elect-Rough (Walls Only)
    Approved
    19 Bldg-Frame
    Approved
    22 Bldg-Sheetrock Nailing
    Approved

    History:
    Nov 30, 2007
    Partially Approved
    Dec 4, 2007
    Approved

    Inspector's Comments

    Nov 30, 2007
    2007-11-30
    Jack Nichols
    walls OKTC
    Last Updated: 2014-10-26 14:02:25 UTC
    65 Elect-Rough (Ceiling Only)
    Approved
    31 Mech-Top/Rough
    Approved
    39 Mech FINAL
    Approved

    Inspector's Comments

    Jan 11, 2008
    2008-01-11
    Jeff Mogler
    RECEIVED AIR BALANCE REPORT
    Last Updated: 2014-10-26 14:02:22 UTC
    194 Fire FINAL
    Approved

    History:
    Dec 18, 2007
    Approved-Pending Others
    Jan 17, 2008
    Approved

    Inspector's Comments

    Jan 17, 2008
    2008-01-17
    Elizabeth Brueck
    Fire Final Passed
    Last Updated: 2014-10-26 14:02:22 UTC
    79 Elect FINAL
    Approved

    History:
    Jan 11, 2008
    Correction Notice
    Jan 17, 2008
    Approved

    Inspector's Comments

    Jan 11, 2008
    2008-01-11
    John E Tindall
    1) complete installation of furniture.

    2) provide LTG-1A,2A

    3) provide updated panel schedules with detail locations of furniture.
    Last Updated: 2014-10-26 14:02:21 UTC
    29 Bldg FINAL
    Approved

    History:
    Jan 14, 2008
    Not Ready
    Jan 17, 2008
    Approved
    Last Updated: 2014-10-26 14:02:20 UTC
    to receive an email alert when the next activity occurs
  • Permit: #0606118
    Building/Commercial/Fire Equipment/Amusement

    Finaled
    Description:
    ANSUL SYSTEM UPGRADE TO UL 300
    Last Updated: May 2, 2006

    Inspection

    Fire-FINAL
    Approved
    Fire-Extinguishers
    Approved
    Fire-Wet Chemical
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0506473
    Building/Commercial/Fire Equipment/Amusement

    Finaled
    Description:
    LOWER 3 FIRE SPRINKLERS THROUGH T BAR CEILING
    Last Updated: May 9, 2005

    Inspection

    Fire-O/H - Plans
    Approved
    Fire-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0503567
    Building/Commercial/Remodel/Office

    Finaled
    Description:
    INSTALL 1.5 TON HEAT PUMP & DUCT WORK FOR OFFICE
    Last Updated: Mar 16, 2005

    Inspection

    Mech-Top/Rough
    Correction Notice
    Mech-FINAL
    Approved
    Plmg-FINAL
    Approved
    Elec-FINAL
    Approved

    History:
    Apr 15, 2005
    Correction Notice
    Nov 16, 2005
    Approved
    Last Updated: 2014-10-28 03:35:52 UTC
    to receive an email alert when the next activity occurs
  • Permit: #0410106
    Building/Commercial/New Structural/Other Struct (non-bldg)

    Finaled
    Description:
    Install platform at Brine Tank and a Walkway to Mechanical Equip.
    Last Updated: Jun 23, 2004

    Inspection

    Bldg-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0315716
    Building/Commercial/Addition/Amusement

    Closed
    Description:
    # 2 KIOSK FOR EL PINTO
    Last Updated: Oct 9, 2003
  • Permit: #0314375
    Building/Commercial/Remodel/Amusement

    Finaled
    Description:
    INSTALL 2 POLE 50 AMP CIRCUIT FOR A HYDROTRACK
    Last Updated: Sep 19, 2003

    Inspection

    Elec-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0304130
    Building/Commercial/Remodel/Other Struct (non-bldg)

    Finaled
    Description:
    ADD NEW 3POLE/TWO THROW SAFETY SWITCH AND ONE DISCONNECT TO ONE EXISTING DISCONNECT FOR THE PURPOSE OF USING THE SAME FEEDER FOR TWO TRASH COMPACTORS.
    Last Updated: Mar 27, 2003

    Inspection

    Elec-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0303291
    Building/Commercial/Remodel/Amusement

    Finaled
    Description:
    INSTALL 4 RECEPTACLES FOR CARD READERS IN TWO LOCATIONS
    Last Updated: Mar 12, 2003

    Inspection

    Elec-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0215945
    Building/Commercial/Remodel/Office

    Void
    Description:
    AUTH TO START WORK/NEW LITING IN VIP ROOM
    Last Updated: Nov 4, 2002
  • Permit: #0204502
    Building/Commercial/Remodel/Amusement

    Closed
    Description:
    4 NEW SUBPANELS, 3 NEW KIOSK ADJACENT TO SUITES F,P&,R, FOR FOOD SALES[2 WITH DEEP FRYERS].& 6 NEW DEEP FRYERS IN EXISTING FOOD CONSESSIONS.
    Last Updated: Apr 5, 2002

    Inspection

    Mech-Top/Rough
    Correction Notice

    History:
    Nov 15, 2002
    Inspector Locked Out (no inspection)
    Nov 20, 2002
    Correction Notice
    Last Updated: 2014-10-30 21:47:33 UTC
    Plmg-Top/Rough
    Correction Notice
    Bldg-Foundation Forms
    Correction Notice
    Elec-Rough (Walls Only)
    Correction Notice

    History:
    Nov 19, 2002
    Correction Notice
    Nov 20, 2002
    Correction Notice
    Nov 22, 2002
    Correction Notice
    Last Updated: 2014-10-30 21:47:29 UTC
    to receive an email alert when the next activity occurs
  • Permit: #0113151
    Building/Commercial/Remodel/Office

    Closed
    Description:
    INTERIOR REMODEL
    Last Updated: Oct 10, 2001

    Inspection

    Plmg-Top/Rough
    Approved

    History:
    Oct 15, 2001
    Not Ready
    Oct 16, 2001
    Approved

    Inspector's Comments

    Oct 15, 2001
    2001-10-15
    KROBINSO
    IVRS - Inspection 0000*
    Last Updated: 2015-09-02 23:21:49 UTC
    Bldg-Frame
    Approved
    Bldg-Sheetrock Nailing
    Approved
    Elec-Rough
    Approved

    History:
    Oct 15, 2001
    Correction Notice
    Oct 24, 2001
    Approved
    Last Updated: 2015-09-02 23:21:48 UTC
    Bldg-Frame Ceiling (T-Bar)
    Approved
    Plmg-FINAL
    Approved
    Elec-FINAL
    Approved
    Bldg-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0112156
    Building/Commercial/New Foundation/Office

    Closed
    Description:
    FOUNDATION ONLY
    Last Updated: Sep 20, 2001

    Inspection

    Bldg-Foundation Forms
    Approved
    Bldg-Frame
    Approved
    Bldg-Sheetrock Nailing
    Re-inspection (Fee Required)

    History:
    Oct 19, 2001
    Partially Approved
    Oct 19, 2001
    Re-inspection (Fee Required)

    Inspector's Comments

    Oct 19, 2001
    2001-10-19
    mw
    exterior s/r ok
    Last Updated: 2015-09-03 01:51:54 UTC
    to receive an email alert when the next activity occurs
  • Permit: #0111774
    Building/Commercial/New Building/Office

    Closed
    Description:
    800 SQFT ADDITION TO AN EXISTING RETAIL STORE (FOUNDATION ON SEP PERMIT)
    Last Updated: Sep 12, 2001

    Inspection

    Elec-FINAL
    Approved

    Inspector's Comments

    Nov 27, 2001
    2001-11-27
    JMCDONA1
    IVRS - Inspection 0000*
    Last Updated: 2015-09-03 03:30:22 UTC
    Bldg-Frame Ceiling (T-Bar)
    Approved
    Mech-FINAL
    Correction Notice

    Inspector's Comments

    Nov 27, 2001
    2001-11-27
    SG
    1- PROVIDE TEST ON RAIN WATER LEADERS.

    2- PROPERLY ATTACH DUCTS TO REGISTERS PER UMC INSTALLATION STANDARDS.

    3- PROVIDE SPACE COMPLIES WITH TITLE 24 REQMITS.

    4- PROVIDE AIR BALANCE TEST PER PLAN AND INDICATE OUTSIDE AIR REQMTS MET.

    5- PROVIDE ACCESS TO HVAC UNIT.

    T-BAR BELOW HARD LID THAT HAS OPENINGS ALLOW UNCONDITION AIR IN SPACE
    Last Updated: 2015-09-03 03:30:23 UTC
    Fire-FINAL
    Approved
    Fire-O/H - No Plans
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0111613
    Building/Commercial/Remodel/Office

    Finaled
    Description:
    ADDITION OF A DOOR BETWEEN PLAYERS LOUNGE AND FAMILY ROOM LOUNGE.
    Last Updated: Sep 10, 2001

    Inspection

    Fire-O/H - No Plans
    Approved
    Fire-FINAL
    Approved
    Bldg-Frame
    Approved
    Bldg-FINAL
    Approved

    History:
    Oct 5, 2001
    Correction Notice
    Oct 19, 2001
    Approved
    Last Updated: 2015-09-03 04:16:43 UTC
    to receive an email alert when the next activity occurs
  • Permit: #0111395
    Building/Commercial/Remodel/Amusement

    Finaled
    Description:
    ADD NEW AIR HANDLER & COMPRESSOR FOR COMPUTER ROOM @ ARCO ARENA
    Last Updated: Sep 5, 2001

    Inspection

    Elec-FINAL
    Approved
    Mech-FINAL
    Approved
    Fire-O/H - No Plans
    Approved
    Fire-FINAL
    Approved
    Plmg-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0104421
    Building/Commercial/Minor/Amusement

    Finaled
    Description:
    ADD (3) NEW 20 AMP 120V CIRCUITS FOR PLUG AND SIGN LIGHT
    Last Updated: Apr 10, 2001

    Inspection

    Elec-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #0013710
    Building/Commercial/Remodel/Retail Store

    Finaled
    Description:
    NEW HVAC SPLIT SYST.
    Last Updated: Nov 14, 2000

    Inspection

    Plmg-Gas Test
    Approved

    History:
    Apr 5, 2001
    Correction Notice
    Apr 6, 2001
    Approved
    Last Updated: 2015-09-03 02:46:38 UTC
    Bldg-Frame
    Approved

    Inspector's Comments

    Apr 6, 2001
    2001-04-06
    GTD
    AC CURBS
    Last Updated: 2015-09-03 02:46:38 UTC
    Mech-FINAL
    Approved
    Bldg-FINAL
    Approved
    Plmg-FINAL
    Approved
    Elec-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #9914574
    Building/Commercial/New Building/Amusement

    Finaled
    Description:
    CONSTUCT NEW SPORTS TRAINING FACILITY
    Last Updated: Dec 27, 1999

    Inspection

    Bldg-Foundation Forms
    Not Ready
    Bldg-Tilt Up
    Partially Approved
    Bldg-Miscellaneous
    Partially Approved

    Inspector's Comments

    Jun 21, 2000
    2000-06-21
    GCM
    PARTIAL APPROVAL TO GROUT CMU WALLS SEE PLANS
    Last Updated: 2015-09-02 20:33:22 UTC
    Plmg-Water Service
    Partially Approved
    Elec-Conduit/Slab
    Approved

    History:
    Aug 15, 2000
    Partially Approved
    Aug 21, 2000
    Approved
    Last Updated: 2015-09-02 20:33:00 UTC
    Elec-Conduit/Underground
    Partially Approved

    History:
    Aug 2, 2000
    Approved
    Sep 18, 2000
    Partially Approved
    Sep 22, 2000
    Partially Approved
    Last Updated: 2015-09-02 20:32:31 UTC
    Bldg-Frame
    Approved

    History:
    Aug 17, 2000
    Correction Notice
    Aug 22, 2000
    Partially Approved
    Sep 12, 2000
    Partially Approved
    Oct 3, 2000
    Approved
    Last Updated: 2015-09-02 20:32:26 UTC
    Bldg-Shear Nail
    Approved

    History:
    Sep 5, 2000
    Correction Notice
    Oct 3, 2000
    Approved
    Last Updated: 2015-09-02 20:32:28 UTC
    Bldg-Roof Plywood Nailing
    Approved

    History:
    Sep 19, 2000
    Partially Approved
    Oct 3, 2000
    Approved
    Last Updated: 2015-09-02 20:32:23 UTC
    Bldg-Roof
    Approved
    Bldg-Exterior Lath/Siding
    Approved
    Plmg-Gas Test
    Approved

    History:
    Sep 5, 2000
    Correction Notice
    Sep 11, 2000
    Partially Approved
    Oct 9, 2000
    Approved

    Inspector's Comments

    Sep 11, 2000
    2000-09-11
    aac
    underground gas piping

    Oct 9, 2000
    2000-10-09
    aac
    24hr graph test ok released gas tag
    Last Updated: 2015-09-02 20:32:14 UTC
    Release-Gas Company
    Approved
    Elec-Temp Power
    Approved

    History:
    Oct 9, 2000
    Correction Notice
    Oct 11, 2000
    Approved

    Inspector's Comments

    Oct 11, 2000
    2000-10-11
    KLH
    10996C
    Last Updated: 2015-09-02 20:32:11 UTC
    Bldg-Sheetrock Nailing
    Partially Approved

    History:
    Sep 21, 2000
    Partially Approved
    Oct 17, 2000
    Partially Approved
    Oct 26, 2000
    Partially Approved
    Last Updated: 2015-09-02 20:31:58 UTC
    Bldg-Frame Ceiling (T-Bar)
    Partially Approved

    History:
    Oct 12, 2000
    Correction Notice
    Oct 20, 2000
    Partially Approved
    Oct 23, 2000
    Partially Approved
    Oct 27, 2000
    Partially Approved
    Last Updated: 2015-09-02 20:31:56 UTC
    Elec-Rough (Walls Only)
    Partially Approved

    History:
    May 23, 2000
    Partially Approved
    Aug 28, 2000
    Partially Approved
    Sep 8, 2000
    Partially Approved
    Sep 20, 2000
    Partially Approved
    Sep 22, 2000
    Partially Approved
    Nov 1, 2000
    Partially Approved

    Inspector's Comments

    May 23, 2000
    2000-05-23
    WR
    OK 11 TILT PANELS
    Last Updated: 2015-09-02 20:31:53 UTC
    Elec-Rough (Ceiling Only)
    Correction Notice

    History:
    Oct 10, 2000
    Correction Notice
    Oct 11, 2000
    Approved
    Oct 12, 2000
    Partially Approved
    Oct 16, 2000
    Partially Approved
    Oct 20, 2000
    Partially Approved
    Nov 14, 2000
    Correction Notice
    Last Updated: 2015-09-02 20:31:41 UTC
    Plmg-Sewer Service
    Partially Approved
    Elec-Rough
    Correction Notice

    History:
    Aug 4, 2000
    Partially Approved
    Aug 21, 2000
    Partially Approved
    Oct 18, 2000
    Partially Approved
    Nov 3, 2000
    Partially Approved
    Nov 8, 2000
    Partially Approved
    Nov 16, 2000
    Correction Notice
    Nov 30, 2000
    Approved
    Dec 1, 2000
    Correction Notice
    Last Updated: 2015-09-02 20:31:32 UTC
    Mech-Top/Rough
    Correction Notice

    History:
    Aug 2, 2000
    Partially Approved
    Aug 30, 2000
    Partially Approved
    Sep 27, 2000
    Partially Approved
    Oct 12, 2000
    Correction Notice
    Oct 19, 2000
    Correction Notice
    Oct 20, 2000
    Partially Approved
    Oct 25, 2000
    Partially Approved
    Oct 31, 2000
    Partially Approved
    Nov 3, 2000
    Partially Approved
    Nov 3, 2000
    Correction Notice
    Nov 14, 2000
    Partially Approved
    Nov 30, 2000
    Partially Approved
    Dec 11, 2000
    Correction Notice

    Inspector's Comments

    Aug 2, 2000
    2000-08-02
    aac
    hard duct ok to insulate

    Aug 30, 2000
    2000-08-30
    aac
    hard duct ok to insulate

    Sep 27, 2000
    2000-09-27
    aac
    hard lid

    Oct 12, 2000
    2000-10-12
    aac
    fsd

    Oct 20, 2000
    2000-10-20
    aac
    t bar

    Oct 25, 2000
    2000-10-25
    aac
    fsd clearance

    Oct 31, 2000
    2000-10-31
    aac
    hard lid and fsd angles

    Nov 3, 2000
    2000-11-03
    aac
    t bar

    Nov 14, 2000
    2000-11-14
    aac
    t bar and fsd angles

    Dec 11, 2000
    2000-12-11
    aac
    roof top
    Last Updated: 2015-09-02 20:31:29 UTC
    Plmg-Underfloor/Slab
    Approved

    History:
    May 30, 2000
    Not Ready
    Jun 22, 2000
    Partially Approved
    Dec 14, 2000
    Approved
    Last Updated: 2015-09-02 20:31:18 UTC
    Plmg-Top/Rough
    Approved

    History:
    Jun 16, 2000
    Partially Approved
    Jul 26, 2000
    Correction Notice
    Jul 28, 2000
    Partially Approved
    Aug 4, 2000
    Partially Approved
    Aug 17, 2000
    Partially Approved
    Aug 18, 2000
    Partially Approved
    Aug 22, 2000
    Partially Approved
    Sep 5, 2000
    Partially Approved
    Sep 6, 2000
    Correction Notice
    Sep 13, 2000
    Partially Approved
    Sep 20, 2000
    Partially Approved
    Oct 4, 2000
    Partially Approved
    Oct 6, 2000
    Partially Approved
    Dec 11, 2000
    Correction Notice
    Dec 14, 2000
    Approved

    Inspector's Comments

    Jul 28, 2000
    2000-07-28
    aac
    roof drains

    Aug 18, 2000
    2000-08-18
    aac
    dwv test ok

    Aug 22, 2000
    2000-08-22
    aac
    roof drains

    Sep 13, 2000
    2000-09-13
    aac
    4'' water service and 6'' roof drains

    Sep 20, 2000
    2000-09-20
    aac
    roof drains

    Dec 11, 2000
    2000-12-11
    aac
    roof top
    Last Updated: 2015-09-02 20:31:16 UTC
    Fire-Alarm System
    Approved
    Mech-FINAL
    Approved

    History:
    Dec 12, 2000
    Correction Notice
    Dec 14, 2000
    Correction Notice
    Dec 15, 2000
    Partially Approved
    Dec 21, 2000
    Correction Notice
    Dec 29, 2000
    Approved

    Inspector's Comments

    Dec 21, 2000
    2000-12-21
    aac
    ok temp c of o
    Last Updated: 2015-09-02 20:30:58 UTC
    Plmg-FINAL
    Approved

    History:
    Dec 14, 2000
    Correction Notice
    Dec 15, 2000
    Partially Approved
    Dec 21, 2000
    Correction Notice
    Dec 29, 2000
    Approved

    Inspector's Comments

    Dec 21, 2000
    2000-12-21
    aac
    ok temp c of o
    Last Updated: 2015-09-02 20:31:00 UTC
    Site-FINAL
    Approved

    History:
    Dec 19, 2000
    Correction Notice
    Jan 16, 2001
    Approved

    Inspector's Comments

    Dec 19, 2000
    2000-12-19
    MJG
    TEMP C/O ISSUED 12/19/00
    Last Updated: 2015-09-02 20:30:56 UTC
    Elec-FINAL
    Approved

    History:
    Dec 8, 2000
    Correction Notice
    Dec 13, 2000
    Partially Approved
    Dec 15, 2000
    Correction Notice
    Dec 19, 2000
    Partially Approved
    Dec 21, 2000
    Partially Approved
    Jan 23, 2001
    Approved

    Inspector's Comments

    Dec 21, 2000
    2000-12-21
    JXE
    OK TO TEMP OCCUPY
    Last Updated: 2015-09-02 20:30:55 UTC
    Bldg-FINAL
    Approved
    Fire-Sprinkler U/G
    Approved
    Fire-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #9812592
    Building/Commercial/Addition/Amusement

    Closed
    Description:
    REVISION OF PLANS TO MATCH INSTALLATION PER TOM M. CN 12-17-98 #9809146
    Last Updated: Dec 24, 1998

    Inspection

    Elec-FINAL
    Re-inspection (Fee Required)
    to receive an email alert when the next activity occurs
  • Permit: #9809146
    Building/Commercial/Addition/Amusement

    Finaled
    Description:
    ANTENNA INSTALLATION - CELL SITE
    Last Updated: Sep 16, 1998

    Inspection

    Elec-Rough
    Correction Notice

    Inspector's Comments

    Dec 15, 1998
    1998-12-15
    TM
    No one available. recall for inspection.
    Last Updated: 2015-09-16 03:18:55 UTC
    Bldg-FINAL
    Approved

    History:
    Dec 11, 1998
    Correction Notice
    Dec 17, 1998
    Approved
    Last Updated: 2015-09-16 03:18:55 UTC
    Elec-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #9716401
    Building/Commercial/Fire Equipment/Office

    Finaled
    Description:
    OH FIRE SPRINKLERS FOR MEZANINE
    Last Updated: Dec 19, 1997

    Inspection

    Fire-FINAL
    Approved
    to receive an email alert when the next activity occurs
  • Permit: #9714147
    Building/Commercial/Addition/Amusement

    Closed
    Description:
    REMODEL TO ADD OFFICES. TWO OFFICES ON MEZZANINE LEVEL & TWO OFFICES ON GROUND LEVEL
    Last Updated: Oct 15, 1997

    Inspection

    Bldg-Concrete Slab Forms
    Approved
    Elec-Rough
    Approved
    Bldg-Frame
    Approved

    History:
    Dec 23, 1997
    Correction Notice
    Jan 26, 1998
    Undefined
    Jan 27, 1998
    Correction Notice
    Jan 28, 1998
    Approved
    Last Updated: 2015-09-15 22:49:32 UTC
    Plmg-Top/Rough
    Correction Notice

    Inspector's Comments

    Jan 28, 1998
    1998-01-28
    TNG
    F. S.DAMPER FRAMING O.K. INSTALL FS DAMPERS PER INSTRUCTIONS. REMOVE SCREWS ON THRU. WALL FIRE DAMPER. OK TO ANGLE EXTERIOR THRU. WALL DAMPER.
    Last Updated: 2015-09-15 22:49:32 UTC
    Bldg-Fire Sprinkler Location
    Correction Notice

    Inspector's Comments

    Feb 4, 1998
    1998-02-04
    WH
    NEED FIRE INSPECTOR
    Last Updated: 2015-09-15 22:49:31 UTC
    Bldg-Sheetrock Nailing
    Approved
    Mech-Top/Rough
    Correction Notice

    History:
    Jan 26, 1998
    Correction Notice
    Jan 30, 1998
    Correction Notice
    Feb 6, 1998
    Correction Notice

    Inspector's Comments

    Jan 26, 1998
    1998-01-26
    tng
    provide proof of fire damper inspection. provide support of flex suct . compkete installation of clips and bolts on hard ducts. provide full flow air ways on flex duct (REMOVE RESTRUCTIONS).

    Jan 30, 1998
    1998-01-30
    tng
    comply with previous correction notice. O.K. to sheet rock upstairs. DO NOT COVER FIRE DAMPERS. PROVIDE MANUFACTURES INSTALLATION INSTRUCTIONS.

    Feb 6, 1998
    1998-02-06
    TNG
    PROVIDE STAMPED AND APPROVED INSTALLATION INSTRUCTIONS ON ALERTED INSTALLATION.
    Last Updated: 2015-09-15 22:49:31 UTC
    Elec-FINAL
    Approved
    Bldg-FINAL
    Approved

    History:
    Mar 18, 1998
    Undefined
    Mar 19, 1998
    Approved
    Last Updated: 2015-09-15 22:49:30 UTC
    Mech-FINAL
    Approved

    History:
    Mar 18, 1998
    Correction Notice
    Apr 2, 1998
    Approved

    Inspector's Comments

    Mar 18, 1998
    1998-03-18
    TNG
    PROVIDE METALIC MATERIAL FOR CONDENSATE, MARK FIRE DAMPERS, PROVIDE ACCESS DOORS AT ALL FIRE DAMPERS.
    Last Updated: 2015-09-15 22:49:30 UTC
    to receive an email alert when the next activity occurs
  • Permit: #973131
    Building/Archive/Archive/Amusement

    Finaled
    Description:
    Commercial interior remodel
    Last Updated: Apr 25, 1997
    to receive an email alert when the next activity occurs
  • Permit: #971925
    Building/Archive/Archive/Amusement

    Finaled
    Description:
    Fire protection hood
    Last Updated: Mar 14, 1997
    to receive an email alert when the next activity occurs
  • Permit: #968641
    Building/Archive/Archive/Amusement

    Closed
    Description:
    Fire sprinklers/ fire line
    Last Updated: Oct 3, 1996
    to receive an email alert when the next activity occurs
  • Permit: #966701
    Building/Archive/Archive/Amusement

    Closed
    Description:
    Commercial interior remodel
    Last Updated: Aug 8, 1996
    to receive an email alert when the next activity occurs
  • Permit: #947467
    Building/Archive/Archive/Amusement

    Finaled
    Description:
    Electrical equipment installation
    Last Updated: Aug 18, 1994
    to receive an email alert when the next activity occurs
  • Permit: #944969A
    Building/Archive/Archive/Amusement

    Finaled
    Description:
    No description available for this case
    Last Updated: Aug 5, 1994
    to receive an email alert when the next activity occurs
  • Permit: #V6673
    Building/Archive/Archive/Amusement

    Closed
    Description:
    ATM
    Last Updated: Jul 31, 1990
    to receive an email alert when the next activity occurs

No results